Final | 5/21/2009 | 5/22/2009 | 5/22/2009 | A | PASS |
Bob Reichert
|
|
|
kyle Phone #: ###-#### called contractor, ok to final
|
Electrical Rough-In | 4/1/2009 | 4/2/2009 | 4/2/2009 | A | PASS |
Pat Lass
|
|
|
Mike- tile floor heat Phone #: ###-####
|
Rough-In Permanent Service | 1/30/2009 | 1/30/2009 | 1/30/2009 | P | PASS |
Pat Lass
|
|
|
mike Phone #: ###-#### check clearance in front of main disconnect on final tree to be removed. R/I Ok P/S U/G R Ok
|
Application received | | | 1/30/2009 | | |
|
|
|
|
Issue permit | | | 1/30/2009 | | DONE |
Barbara Stitt
|
|
|
|