Final | 4/29/2009 | 4/30/2009 | 4/30/2009 | A | PASS |
Bob Reichert
|
|
|
Please final this project. Electrical contractor will be at the job site with property owner anytime after 9:30am. Call Dave with any questions Phone #: ###-#### Internet Inspection Request from: David Mackey called contractor, ok to final
|
Electrical Rough-In | 4/10/2009 | 4/10/2009 | 4/10/2009 | P | PASS |
Bob Reichert
|
|
|
Alan- floor/tile heat Phone #: ###-#### corrections made, ok cover floor heat 2 baths only
|
Electrical Rough-In | 4/9/2009 | 4/10/2009 | 4/10/2009 | A | FAIL |
Jack Frank
|
|
|
please provide rough in inspection for bathroom radient floor heat in main and master bathroom. Call Dave if you have any questions. Phone #: ###-#### Internet Inspection Request from: David Mackey called 110.3(B) shall follow manufactures instructions for installation of floor heat, I marked the sections on instruction sheet, spacing and placement of sensor lead
|
Electrical Rough-In | 3/2/2009 | 3/3/2009 | 3/3/2009 | P | PASS |
Bob Reichert
|
|
|
Electrical Rough in inspection requested for remodel. Phone #: ###-#### Internet Inspection Request from: David Mackey ric ok
|
Application received | | | 2/23/2009 | | DONE |
|
|
|
This permit was created on the web by David Mackey
|