Final | 5/27/2009 | 5/28/2009 | 5/28/2009 | A | PASS |
Bob Reichert
|
|
|
Jared Phone #: ###-#### called contractor to survey secure mounting of receptacles, open ground in garage receptacles, gfci by water heater slowly operates, rest ok, ok to final
|
Permanent Service | 3/18/2009 | 3/18/2009 | 3/18/2009 | P | PASS |
Jack Frank
|
|
|
lars Phone #: ###-#### p/s u/g rec. ok
|
Electrical Rough-In | 3/18/2009 | 3/18/2009 | 3/18/2009 | P | PASS |
Jack Frank
|
|
|
Jared Phone #: ###-#### ok
|
Electrical Rough-In | 3/16/2009 | 3/17/2009 | 3/17/2009 | P | FAIL |
Jack Frank
|
|
|
lars - please call ahead for access Phone #: ###-#### called corr do not cover posted 210.52(A) needs outlet wall space fam. rm. 314.16 box fill 2 bed rms upstairs, and din. rm. 210.52(B) remove range hood from kit. SABC, 314.20 all outside boxes shall be flush with siding at time of r/i, 334.23 protect cables within 6ft of attic access, 250.148 splice all equip. grds together 2 gang left of kit. sink, 110.3(A) shall provide 16"x20" access for j tub equip per manufacture's instructions at time of r/i, j tub listing ok
|
Reinspection Fee (no hold) | 3/17/2009 | 3/17/2009 | 3/17/2009 | P | PASS |
Jack Frank
|
|
|
lars - please call ahead for access Phone #: ###-#### fee due corr.
|
Application received | | | 3/12/2009 | | |
|
|
|
|
Issue permit | | | 3/12/2009 | | DONE |
|
|
|
|