First Notice | 12/18/2009 | 12/18/2009 | 4/22/2010 | | DONE |
Bob Reichert
|
|
|
|
Final | 12/18/2009 | 12/18/2009 | 12/18/2009 | P | PASS |
Bob Reichert
|
|
|
Jim Phone #: ###-#### ok to final, signed occupancy card, no esc this project
|
Final | 12/17/2009 | 12/17/2009 | 12/17/2009 | P | PART |
Doug A Poedy
|
|
|
jim - partial Phone #: ###-####. Marked on plans what was finaled.
|
Permanent Service | 10/28/2009 | 10/28/2009 | 10/28/2009 | P | PASS |
Mike Kinnear
|
|
|
Jim Phone #: ###-#### p/s u/g n ok note doors need to have panick bars & needs to be unlocked at all times. will check at final..
|
Electrical Rough-In | 9/2/2009 | 9/3/2009 | 9/3/2009 | A | PART |
Doug A Poedy
|
|
|
jim Phone #: ###-####. wall cover ok.
|
ELE-Aging Inspection | 8/21/2009 | 8/21/2009 | 8/28/2009 | | DONE |
Bob Reichert
|
|
|
no activity, suc
|
Electrical Rough-In | 6/12/2009 | 6/12/2009 | 6/12/2009 | P | PART |
Jack Frank
|
|
|
Jim Phone #: ###-#### concrete encased electrode ok
|
Override - Parcel Holds | 6/12/2009 | 1/1/1900 | 6/12/2009 | | |
|
|
|
Not in affected area
|
Electrical Rough-In | 4/8/2009 | 4/9/2009 | 4/9/2009 | A | PASS |
Mike Kinnear
|
|
|
Jim Phone #: ###-#### ok cover under slab conduit
|
Electrical Rough-In | 4/7/2009 | 4/7/2009 | 4/7/2009 | P | PART |
Mike Kinnear
|
|
|
Jim Phone #: ###-#### ok cover under ground conduit (low voltage)
|
Electrical Rough-In | 3/31/2009 | 3/31/2009 | 3/31/2009 | P | PART |
Pat Lass
|
|
|
Jim Phone #: ###-#### underground ok no esc in project
|
Override - Parcel Holds | 3/31/2009 | 1/1/1900 | 3/31/2009 | | |
|
|
|
rough only
|
Application received | | | 3/30/2009 | | DONE |
|
|
|
This permit was created on the web by Todd Sellman
|