Electrical Rough-In | 4/14/2009 | 4/14/2009 | 4/14/2009 | P | PASS |
Mike Kinnear
|
|
|
Installed disconnect, VFD and line voltage wiring to new pump located in penthouse. Climatech installed control conduit and wiring. Please final if approved. Phone #: ###-#### Internet Inspection Request from: Dan Wright ok ri
|
Final | 4/14/2009 | 4/14/2009 | 4/14/2009 | P | PASS |
Mike Kinnear
|
|
|
Installed disconnect, VFD and line voltage wiring to new pump located in penthouse. Climatech installed control conduit and wiring. Please final if approved. Phone #: ###-#### Internet Inspection Request from: Dan Wright ok final note no esc permit in project
|
Owner Supplied Equipment | | | 4/8/2009 | | |
|
|
|
|
Application received | | | 4/8/2009 | | DONE |
|
|
|
This permit was created on the web by Dan Wright
|
First Notice | 4/14/2009 | 4/14/2009 | | | |
Mike Kinnear
|
|
|
|