Final | 7/2/2009 | 7/6/2009 | 7/6/2009 | A | PASS |
Doug A Poedy
|
|
|
This inspection for a heat pump hook up can be inspected outside. Enter from alley to view new 200a panel and heat pump. Call Dave at ###-#### prior to inspection. Phone #: ###-#### Internet Inspection Request from: Dave Friend Ok final. No esc permit.
|
Final | 6/26/2009 | 6/29/2009 | 6/29/2009 | P | FAIL |
Bob Reichert
|
|
|
All work was installed outside. Drive in alley to back lawn. New heat pump is install and wired to the outside 200A panel.Call Daveat ###-#### prior so I may meet you there since residence livivng there is elderly. Phone #: ###-#### Internet Inspection Request from: Dave Friend called, left correction notice, Nec 352.12shall use schedule 80 pvc where subject to physical damage, 200.6 shall not use white wire for phase conductor, 422.11(A) overcurrent device shall not exceed rating as marked on nameplate, no esc this project
|
Application received | | | 4/8/2009 | | DONE |
|
|
|
This permit was created on the web by Dave Friend
|