Final | 7/7/2009 | 7/8/2009 | 7/8/2009 | A | PASS |
Doug A Poedy
|
|
|
mark Phone #: ###-#### ok final
|
Override - Parcel Holds | 7/7/2009 | 1/1/1900 | 7/7/2009 | | |
|
|
|
ele only
|
Electrical Rough-In | 4/29/2009 | 4/29/2009 | 4/29/2009 | P | PASS |
Bob Reichert
|
|
|
Mark Phone #: ###-#### called contractor, ric ok, no esc this project
|
Override - Parcel Holds | 4/29/2009 | 1/1/1900 | 4/29/2009 | | |
|
|
|
already been dbl fee
|
Electrical Rough-In | 4/27/2009 | 4/28/2009 | 4/28/2009 | A | PART |
Pat Lass
|
|
|
mark Phone #: ###-#### ok to cover all but cold air returns
|
Override - Parcel Holds | 4/27/2009 | 1/1/1900 | 4/27/2009 | | |
|
|
|
electrical only
|
Override - Parcel Holds | 4/27/2009 | 1/1/1900 | 4/27/2009 | | |
|
|
|
Already paid double fee for electrical
|
Electrical Rough-In | 4/23/2009 | 4/24/2009 | 4/24/2009 | P | FAIL |
Pat Lass
|
|
|
Mark Phone #: ###-#### Posted partial correction walls to be opened up for full inspection after corrections are made.
|
Override - Parcel Holds | 4/23/2009 | 1/1/1900 | 4/23/2009 | | |
|
|
|
ELE has been double fee
|
Application received | | | 4/20/2009 | | |
|
|
|
|
Override - Parcel Holds | | | 4/20/2009 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/20/2009 | | DONE |
Barbara Stitt
|
|
|
|