Final | 7/16/2009 | 7/16/2009 | 7/16/2009 | P | PASS |
Doug A Poedy
|
|
|
Doug I will have the corrections you mentioned completed by noon today ready for your sign off thanks Brad Phone #: ###-#### Internet Inspection Request from: Brad Baker. Ok final
|
Final | 7/15/2009 | 7/15/2009 | 7/15/2009 | P | FAIL |
Doug A Poedy
|
|
|
Final is ready please call if you have any questions it should be open all day thank you Brad Phone #: ###-#### Internet Inspection Request from: Brad Baker.NEC 210.8 (a) 2 GFCI protection in garages. NEC 110.3 (b) Installation of equipment shall be installed and used in accordance to instructions. NEC 250.94 Intersystem bonding termination bar shall be installed.Called and notified Brad.
|
Rough-In Permanent Service | 5/8/2009 | 5/8/2009 | 5/8/2009 | P | PASS |
Bob Reichert
|
|
|
should be ready for inspection by 1:00PM please call Brad with any questions Phone #: ###-#### Internet Inspection Request from: Brad Baker ric ok, called contractor, p/s u/g n (rec) ok
|
Application received | | | 5/8/2009 | | DONE |
|
|
|
This permit was created on the web by Brad Baker
|