Final | 7/7/2009 | 7/8/2009 | 7/8/2009 | A | PASS |
Bob Reichert
|
|
|
george Phone #: ###-#### called, corrections made, ok to final, no esc this project
|
Electrical Rough-In | 6/23/2009 | 6/24/2009 | 6/24/2009 | A | PART |
Jack Frank
|
|
|
george Phone #: ###-#### u/g ok , called corr for p/s at garage 250.32 needs electrodes at garage
|
Electrical Rough-In | 6/23/2009 | 6/23/2009 | 6/23/2009 | P | CANC |
Jack Frank
|
|
|
george Phone #: ###-#### contr called he covered u/g before inspection, needs to uncover
|
Electrical Rough-In | 6/18/2009 | 6/18/2009 | 6/18/2009 | P | NH |
Jack Frank
|
|
|
George Phone #: ###-#### called left message
|
Reinspection Fee (no hold) | 6/18/2009 | 6/18/2009 | 6/18/2009 | P | PASS |
Jack Frank
|
|
|
George Phone #: ###-#### called left message notice posted no access fee due
|
Application received | | | 6/18/2009 | | |
|
|
|
|
Issue permit | | | 6/18/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|