First Notice | 7/26/2010 | 7/26/2010 | 3/15/2012 | | DONE |
Jack Frank
|
|
|
This permit finaled on the web by Shawna Gates
|
Final | 7/23/2010 | 7/26/2010 | 7/26/2010 | A | PASS |
Jack Frank
|
|
|
Nick is the contact his cell is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates
|
Electrical Rough-In | 7/2/2010 | 7/2/2010 | 7/2/2010 | P | PASS |
Jack Frank
|
|
|
Final for phase 11. Greg is the contact his no. is ###-####. Inspection requested from web by: Shawna Gates Phone #: ###-####
|
Final | 6/10/2010 | 6/11/2010 | 6/11/2010 | A | PART |
Jack Frank
|
|
|
Final for phase 10 only. Please don''t final permit. Nick is the contact his no. is ###-#### ok
|
Electrical Rough-In | 6/1/2010 | 6/2/2010 | 6/3/2010 | A | PASS |
Jack Frank
|
|
|
Ceiling inspection. Nick is the contact his no. is ###-####. Inspection requested from web by: Shawna Gates Phone #: ###-#### phase 10 ceings ok
|
Electrical Rough-In | 5/27/2010 | 5/28/2010 | 5/28/2010 | A | PART |
Doug A Poedy
|
|
|
Walls, Nick is the contact his no. is ###-####. Inspection requested from web by: Shawna Gates Phone #: ###-####
|
Electrical Rough-In | 5/27/2010 | 5/27/2010 | 5/27/2010 | P | CANC |
Doug A Poedy
|
|
|
Walls, Nick is the contact his no. is ###-####. Inspection requested from web by: Shawna Gates Phone #: ###-#### Inspection cancelled from web by: Shawna Gates
|
Final | 5/17/2010 | 5/17/2010 | 5/17/2010 | A | PART |
Jack Frank
|
|
|
Final for phase 9 only, please dont final the permit. Nick is the contact. Could you please call 30 min. prior so he can be onsite? His cell no. is ###-####. Thank you. Inspection requested from web by: Shawna Gates Phone #: ###-#### final for phase 9 ok
|
Electrical Rough-In | 5/6/2010 | 5/7/2010 | 5/7/2010 | A | CANC |
Jack Frank
|
|
|
Nick is the contact his no. is ###-####. Inspection requested from web by: Shawna Gates Phone #: ceilings ok
|
Electrical Rough-In | 5/3/2010 | 5/4/2010 | 5/4/2010 | A | PASS |
Jack Frank
|
|
|
nick \\ note to inspector please inspect areas of job that are not part of the plan mod that is turned into Boise City Phone #: ###-####
|
Electrical Rough-In | 4/29/2010 | 4/29/2010 | 4/29/2010 | A | PART |
Jack Frank
|
|
|
walls ok S W corner
|
Electrical Rough-In | 3/15/2010 | 3/16/2010 | 3/16/2010 | A | PART |
Doug A Poedy
|
|
|
Final for phase 8 only. This is for Doherty Electric work only. Mike is the contact his no is ###-####. Inspection requested from web by: Shawna Gates Phone #: ###-####. Phase 8 ok.
|
Electrical Rough-In | 3/8/2010 | 3/9/2010 | 3/9/2010 | A | PART |
Jack Frank
|
|
|
Nick is the contact his no. is ###-####. Thank you. Inspection requested from web by: Shawna Gates Phone #: ###-#### walls anop
|
Electrical Rough-In | 3/2/2010 | 3/2/2010 | 3/2/2010 | P | PART |
Jack Frank
|
|
|
Nick is the onsite contact his no. is ###-####. Inspection requested from web by: Shawna Gates Phone #: ###-#### walls anop
|
Electrical Rough-In | 2/23/2010 | 2/23/2010 | 2/23/2010 | P | FAIL |
Jack Frank
|
|
|
Ceiling inspection. Nick is the contact his no. is ###-####. Thank you. Inspection requested from web by: Shawna Gates Phone #: ###-#### general contr covered before inspection will have Doug Poedy talk to him
|
Electrical Rough-In | 2/10/2010 | 2/10/2010 | 2/10/2010 | P | PART |
Bob Reichert
|
|
|
Made corrections on grid fixtures. Nick is the onsite contact his no. is ###-####. Inspection requested from web by: Shawna Gates Phone #: ###-#### ceiling ok in central phase 6, south part not done yet
|
Electrical Rough-In | 2/9/2010 | 2/10/2010 | 2/10/2010 | A | CANC |
Jack Frank
|
|
|
Made corrections on grid fixtures. Onstie contact is Nick his no. is ###-####. Inspection requested from web by: Shawna Gates Phone #: ###-#### Inspection cancelled from web by: Shawna Gates
|
Electrical Rough-In | 2/9/2010 | 2/9/2010 | 2/9/2010 | P | FAIL |
Doug A Poedy
|
|
|
MIKE Phone #: ###-####. Fixtures above ceiling laying on grid. NEC 314.23 J-box supports in small offices. Smurf conduit laying on grid in small offices.
|
Electrical Rough-In | 1/29/2010 | 2/1/2010 | 2/1/2010 | A | PART |
Bob Reichert
|
|
|
Ceiling inspection. Nick is the contact his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates central part phase 7 ceiling only ok to cover
|
Final | 2/1/2010 | 2/1/2010 | 2/1/2010 | A | PART |
Bob Reichert
|
|
|
Ceiling inspection. Nick is the contact his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates central part phase 7 only ok for t/o
|
Electrical Rough-In | 1/28/2010 | 1/29/2010 | 1/29/2010 | P | CANC |
Bob Reichert
|
|
|
Ceiling inspection. The contact is Nick his no. ###-####. Thank you. Internet Inspection Request from: Shawna Gates Inspection cancelled from web by: Shawna Gates
|
Electrical Rough-In | 1/25/2010 | 1/26/2010 | 1/26/2010 | A | PART |
Jack Frank
|
|
|
Nick is the onsite contact his no. is ###-####. Thank you! Phone #: ###-#### Internet Inspection Request from: Shawna Gates walls anop
|
Electrical Rough-In | 1/22/2010 | 1/25/2010 | 1/25/2010 | A | PASS |
Jack Frank
|
|
|
Nick said he talked to you about being there at 7:30am if possible. This is a ceiling inspection. Nicks no. is ###-####. Thank You! Phone #: ###-#### Internet Inspection Request from: Shawna Gates walls and ceilings ok
|
Electrical Rough-In | 1/18/2010 | 1/19/2010 | 1/19/2010 | A | PART |
Jack Frank
|
|
|
Nick is the on site contact his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates see added r/i that failed, note r/i for new entry ok only, walls and ceiling
|
Electrical Rough-In | 1/19/2010 | 1/19/2010 | 1/19/2010 | A | FAIL |
Jack Frank
|
|
|
Nick is the on site contact his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates correction posted for new front desk area, B M C 4-05-23 unlawful to conceal grid ceiling covered by general contr before inspection
|
Electrical Rough-In | 1/11/2010 | 1/11/2010 | 1/11/2010 | P | PART |
Jack Frank
|
|
|
Nick is the contact his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates walls anop
|
Electrical Rough-In | 12/16/2009 | 12/16/2009 | 12/16/2009 | P | PART |
Jack Frank
|
|
|
Fianl phase 5. Nick is the contact his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates r/i ok corrections made
|
Final | 12/16/2009 | 12/16/2009 | 12/16/2009 | P | PART |
Jack Frank
|
|
|
Fianl phase 5. Nick is the contact his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates t/o for ph #5 ok
|
Electrical Rough-In | 12/10/2009 | 12/11/2009 | 12/11/2009 | A | PART |
Bob Reichert
|
|
|
Nick is the onsite contact, his cell no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates walls for phase 6 anop ok to cover, left correction notice for phase 5 and 6-NEC 300.11 raceways, boxes, and cable assemblies shall be securely fastened in place. Support wires shall be secured at both ends. 362.30(A) ent shall be secured within 3' of box and every 3'. BCC no violations shall be retained
|
Electrical Rough-In | 12/8/2009 | 12/8/2009 | 12/8/2009 | P | PASS |
Bob Reichert
|
|
|
Nick is the onsite contact,his no. is ###-####. Thank you. Phone #: ###-#### Internet Inspection Request from: Shawna Gates ok to cover phase 5 wall only
|
Electrical Rough-In | 12/7/2009 | 12/8/2009 | 12/8/2009 | A | CANC |
Bob Reichert
|
|
|
Final for phase 2. Nick is the onsite contact his number is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates see part final
|
Final | 12/8/2009 | 12/8/2009 | 12/8/2009 | A | PART |
Bob Reichert
|
|
|
Final for phase 2. Nick is the onsite contact his number is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates ok to final phase 2 only
|
Conference | 12/4/2009 | 12/7/2009 | 12/7/2009 | A | DONE |
Mike Kinnear
|
|
|
Please call Mike 30 min. prior to conference at ###-####. We would like to schedule this for 10:00am if possible. Phone #: ###-#### Internet Inspection Request from: Shawna Gates-- had conf. with arch. owner rep. general contractor, & electrical contractor. Explained code violations shall not be retained. The inspections called in for the work shall be ready with called in or there will be a reinspection fee to the electrical contractor.
|
Electrical Rough-In | 12/3/2009 | 12/4/2009 | 12/4/2009 | P | FAIL |
Bob Reichert
|
|
|
Late in the afternoon if possible. Nick is the contact his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates called, left correction notice,NEC 110.12(A) shall close unused openings, 300.11(a)(1) cables and raceways shall not be supported bt ceiling grid wires, 314.25 shall provide cobers for switches and receptacles, 406.4 receptacles shall be securely supported, 330.30(A) mc cable shall be secured within 12" of box, BCC No violations shall be retained
|
Electrical Rough-In | 12/1/2009 | 12/2/2009 | 12/2/2009 | A | CANC |
Bob Reichert
|
|
|
This is for a final on phase 4 only. Nick is the contact his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates see part final for phase 4
|
Final | 12/2/2009 | 12/2/2009 | 12/2/2009 | A | PART |
Bob Reichert
|
|
|
This is for a final on phase 4 only. Nick is the contact his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates ok to final phase 4
|
Electrical Rough-In | 11/16/2009 | 11/16/2009 | 11/16/2009 | P | PASS |
Jack Frank
|
|
|
Nick is the onsite contact his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates walls phase 4
|
Electrical Rough-In | 11/9/2009 | 11/10/2009 | 11/10/2009 | A | PASS |
Jack Frank
|
|
|
Nick is the onsite contact his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates walls phase 4
|
Electrical Rough-In | 11/3/2009 | 11/4/2009 | 11/4/2009 | A | FAIL |
Bob Reichert
|
|
|
Nick is the onsite contact his no. is ###-####. Thank you. Phone #: ###-#### Internet Inspection Request from: Shawna Gates met contractor, using shallow studs, 1 1/4" for cable and nailplates, told to fix and recall
|
Final | 10/29/2009 | 10/29/2009 | 10/29/2009 | P | PART |
Doug A Poedy
|
|
|
Final for phase 3 only. Please don''t final out permit. Nick is the onsite contact his no is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates. Ok final phase 3.
|
Conference | 10/14/2009 | 10/15/2009 | 10/15/2009 | A | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/14/2009 at 3:28:48 PM. Contact: ###-####. this was called in by gen contr not ele contr told gen he cannot request inspections on ele permit, I already explained no violations to be retained for support of cables above ceilings, and removal of all abandoned cables
|
Electrical Rough-In | 10/14/2009 | 10/14/2009 | 10/14/2009 | A | PART |
Jack Frank
|
|
|
Ceiling inspection. Nick is the onsite contact his cell no. is ###-####. Thank you. Phone #: ###-#### Internet Inspection Request from: Shawna Gates no cover needed corr. posted for no violations retained support all cables and raceways, remove al lowvoltage not being used
|
Electrical Rough-In | 10/8/2009 | 10/8/2009 | 10/8/2009 | P | PASS |
Jack Frank
|
|
|
NICK IS THE ONSITE CONTACT HIS CELL NO. IS ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates walls phase # 3
|
Application received | | | 10/8/2009 | | DONE |
|
|
|
This permit was created on the web by Shawna Gates
|
Electrical Rough-In | 4/28/2010 | 4/29/2010 | | A | |
|
|
|
Mike Phone #: ###-####
|