Final | 11/12/2009 | 11/12/2009 | 11/12/2009 | P | PASS |
Jack Frank
|
|
|
John Phone #: ###-#### ok card signed
|
Electrical Rough-In | 11/3/2009 | 11/3/2009 | 11/3/2009 | P | PASS |
Jack Frank
|
|
|
john - please call 1/2 hr prior Phone #: ###-#### walls ok
|
Override - Parcel Holds | 11/3/2009 | 1/1/1900 | 11/3/2009 | | |
|
|
|
rough in
|
Final | 10/27/2009 | 10/28/2009 | 10/28/2009 | A | CANC |
Bob Reichert
|
|
|
John-Please call at least 30 mins prior so he can meet ya there Phone #: ###-#### see ri, no esc this projct
|
Electrical Rough-In | 10/28/2009 | 10/28/2009 | 10/28/2009 | A | FAIL |
Bob Reichert
|
|
|
John-Please call at least 30 mins prior so he can meet ya there Phone #: ###-#### looked at opened up walls with contractor, left correction notice, BCC no violations shall be retained, NEC 250 shall add ground screws,300 shall maintain 1 1/4",330,358 shall provide strapping, 300 shall provide free length of conductor, shall upgrade panel schedule, no esc this project
|
Override - Parcel Holds | 10/27/2009 | 1/1/1900 | 10/27/2009 | | |
|
|
|
already has permit
|
Final | 10/23/2009 | 10/26/2009 | 10/26/2009 | A | CANC |
Jack Frank
|
|
|
John ###-#### final insp on fire exit lights called contr needs wiring done without permit, or inspection uncovered. note work was done 5 years ago
|
Conference | 10/23/2009 | 10/26/2009 | 10/26/2009 | A | CANC |
Jack Frank
|
|
|
John ###-####, please call 30 min prior to meet you for conference, check work already done by previous contractor/tenant
|
Override - Parcel Holds | | | 10/23/2009 | | |
|
|
|
|
Application received | | | 10/23/2009 | | |
|
|
|
|
Override - Parcel Holds | | | 10/23/2009 | | |
|
|
|
|
Issue & PRINT permit | | | 10/23/2009 | | |
Tisha Gallop
|
|
|
|
Override - Parcel Holds | | | 10/23/2009 | | |
|
|
|
|
First Notice | 11/12/2009 | 11/12/2009 | | | |
Jack Frank
|
|
|
|