Final | 1/14/2010 | 1/14/2010 | 1/14/2010 | P | PASS |
Jack Frank
|
|
|
All done ready for you thanks Phone #: ###-#### Internet Inspection Request from: Don Lustig ok card signed
|
Conference | 12/30/2009 | 12/30/2009 | 12/30/2009 | A | DONE |
Jack Frank
|
|
|
Corey should be there around 8 if you can stop this morning to look at all the x ray parts. thanks Phone #: ###-#### Internet Inspection Request from: Don Lustig ok
|
Conference | 12/29/2009 | 12/29/2009 | 12/29/2009 | P | DONE |
Jack Frank
|
|
|
if possible we would like you to look at the xray machine installation for approval of the wiring methods we are ready any time you are thanks Phone #: ###-#### Internet Inspection Request from: Don x-ray equip listed
|
Final | 12/28/2009 | 12/28/2009 | 12/28/2009 | P | PART |
Jack Frank
|
|
|
please stop by and check us out a couple items are missing beyond our control but should be able to get a temp occ. Thanks Corey is on site for a walk thru. Phone #: ###-#### Internet Inspection Request from: Don Lustig t/o ok card signed
|
Electrical Rough-In | 12/9/2009 | 12/9/2009 | 12/9/2009 | P | PASS |
Bob Reichert
|
|
|
Ceiling cover inspection needed thanks Phone #: ###-#### Internet Inspection Request from: Don Lustig ok to cover ceilings
|
Electrical Rough-In | 11/12/2009 | 11/12/2009 | 11/12/2009 | P | PASS |
Jack Frank
|
|
|
ready for wall cover anytime today we are done so if you are in the area Phone #: ###-#### Internet Inspection Request from: Don Lustig ok
|
Owner Supplied Equipment | | | 11/6/2009 | | |
|
|
|
|
Application received | | | 11/6/2009 | | DONE |
|
|
|
This permit was created on the web by Don Lustig
|
First Notice | 1/14/2010 | 1/14/2010 | | | |
Jack Frank
|
|
|
|