Final | 2/16/2010 | 2/16/2010 | 2/16/2010 | P | PASS |
Bob Reichert
|
|
|
Key is under the mat at the front door, please call if you have any questions Inspection requested from web by: Mark Hennequin Phone #: ###-#### ok to final, no esc this project
|
Permanent Service | 1/10/2010 | 1/11/2010 | 1/11/2010 | A | PASS |
Doug A Poedy
|
|
|
Can you please call me 10 minutes before you get there, so I can try and meet you if possible. Thanks, Mark Phone #: ###-#### Internet Inspection Request from: Mark Hennequin P/S Connect ok.
|
Conference | 12/28/2009 | 12/28/2009 | 12/28/2009 | A | DONE |
Doug A Poedy
|
|
|
|
Conference | 12/27/2009 | 12/28/2009 | 12/28/2009 | A | DONE |
Doug A Poedy
|
|
|
could you please call me 30 minutes in advance so I can meet you there and ask you questions. Thanks you, Mark Phone #: ###-#### Internet Inspection Request from: Mark Hennequin
|
Permanent Service | 12/23/2009 | 12/23/2009 | 12/23/2009 | P | FAIL |
Bob Reichert
|
|
|
Could you please call me ten minutes before you get there to see if I can meet you if possible. Thanks, Mark Phone #: ###-#### Internet Inspection Request from: Mark Hennequin called, left message, left correction notice, NEC 334.15(B) nm cable shall be protected from physical damage at sub-panel, 110.26 shall provide work space about sub-panel, and no water pipe below service panel, 250.24(A) shall run gec to grounded electrode terminal bar, 250.53(G) electrodes shall be installed such that 8' of length is in contact with soil, no esc this project
|
Electrical Rough-In | 11/19/2009 | 11/19/2009 | 11/19/2009 | P | PASS |
Doug A Poedy
|
|
|
Mark Phone #: ###-####. Ok to cover. Notified contractor that he needs to add 3 rooms to his permit.
|
Application received | | | 11/9/2009 | | |
|
|
|
|
Issue permit | | | 11/9/2009 | | DONE |
|
|
|
|