Final | 1/26/2010 | 1/26/2010 | 1/26/2010 | P | PASS |
Jack Frank
|
|
|
Arlin-PLeae call prior to inspection Phone #: ###-####
|
Electrical Rough-In | 1/5/2010 | 1/5/2010 | 1/5/2010 | P | CANC |
Jack Frank
|
|
|
Arlin Phone #: ###-#### met with owner needs light and 3way switching for stairs, and equip grd bus for panel r/i ok
|
Electrical Rough-In | 11/19/2009 | 11/20/2009 | 11/20/2009 | A | PASS |
Jack Frank
|
|
|
underground Phone #: ###-#### ok
|
Conference | 11/17/2009 | 11/18/2009 | 11/18/2009 | A | DONE |
Jack Frank
|
|
|
call Arlin prior to going he needs to be to work by 11:00 Phone #: ###-#### went over nec requirements with owner
|
Application received | | | 11/13/2009 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/13/2009 | | DONE |
|
|
|
|