First Notice | 1/7/2010 | 1/7/2010 | 1/6/2012 | | DONE |
Bob Reichert
|
|
|
This permit finaled on the web by Barbara Stitt
|
Final | 1/6/2010 | 1/7/2010 | 1/7/2010 | A | PASS |
Bob Reichert
|
|
|
Bob, this is a tool out at Bldg 80 in the fab. Sup05 Ken heller 7072161 Phone #: ###-#### Internet Inspection Request from: Ken Heller ok to final, no esc this project
|
Conference | 1/5/2010 | 1/6/2010 | 1/6/2010 | A | DONE |
Bob Reichert
|
|
|
Bob,If possible Micron would like to talk to you about our Emergency systems in our buildings and make sure we are in compliance with what the NEC says and the City of Boise is requiring. Phone #: ###-#### Internet Inspection Request from: Paul Cook called, told paul that ok to add load to existing emergency system since city doesn't regulate the system as far as required emergency or optional stand-by system or system for industrial processes. Said that they would be able to determine needed loads on the existing system. no esc this project
|
Owner Supplied Equipment | | | 11/17/2009 | | |
|
|
|
|
Application received | | | 11/17/2009 | | DONE |
|
|
|
This permit was created on the web by Ken Heller
|