Final | 3/8/2010 | 3/8/2010 | 3/9/2010 | P | PASS |
Jack Frank
|
|
|
wayne Phone #: ###-#### ok
|
Final | 2/26/2010 | 3/1/2010 | 3/1/2010 | A | FAIL |
Bob Reichert
|
|
|
Wayne Phone #: ###-#### met contractor, left correction notice, NEC 400.8(1) flexible cord shall not be used as a substitute for fixed wiring of structure, 410.62(C) shall permit cord connected if meetrs part (C)(1), NOTE corrections shall be made within 5 working days or further action will be taken, no esc this project
|
Final | 2/26/2010 | 2/26/2010 | 2/26/2010 | P | CANC |
Jack Frank
|
|
|
call ###-#### (waynelee) he has the key ,To the bldg. call 20 min.before to make sure he can meet you ther to unlock the bldg.thks Inspection requested from web by: cris flores Phone #: ###-#### told contr to contact Doug reguarding all dakota lighting, products
|
Electrical Rough-In | 2/26/2010 | 2/26/2010 | 2/26/2010 | P | CANC |
Jack Frank
|
|
|
told contr, he needs to contact Doug about inspections reguarding dakota lighting
|
Owner Supplied Equipment | | | 2/15/2010 | | |
|
|
|
|
Application received | | | 2/15/2010 | | DONE |
|
|
|
This permit was created on the web by cris flores
|
First Notice | 3/9/2010 | 3/9/2010 | | | |
Jack Frank
|
|
|
|