First Notice | 9/17/2010 | 9/17/2010 | 11/16/2010 | | DONE |
Doug A Poedy
|
|
|
This permit finaled on the web by Rick Beckman
|
Final | 9/17/2010 | 9/17/2010 | 9/17/2010 | P | PASS |
Doug A Poedy
|
|
|
|
Final | 9/14/2010 | 9/14/2010 | 9/14/2010 | P | CANC |
Doug A Poedy
|
|
|
every thing is good now on the paint booth according to the fire inspector so this project just needs to be signed off. My contractor says you don''t even need to go out to the site. Thanks Rick Phone #: ###-#### >> Inspection requested via web by Rick Beckman
|
Final | 9/3/2010 | 9/7/2010 | 9/7/2010 | A | FAIL |
Bob Reichert
|
|
|
Jason Phone #: ###-#### >> Inspection requested via web by Rick Beckman called contractor, left correction notice, BCC 4-05-33(A),(B) all equipment shall be listed by a nationally recognized testing lab, NEC 110.3(A),(B) equipment shall be suitable for use and installed per listing instructions, NOTE: corrections shall be made within 10 working days or further action will be taken such as removal of power
|
Permanent Service | 8/26/2010 | 8/27/2010 | 8/27/2010 | A | PASS |
Bob Reichert
|
|
|
Rick Phone #: ###-#### >> Inspection requested via web by Rick Beckman p/s, exst meter pak, n, ok, 1 meter only
|
Permanent Service | 8/26/2010 | 8/26/2010 | 8/26/2010 | P | CANC |
Bob Reichert
|
|
|
Rick Phone #: ###-#### >> Inspection requested via web by Rick Beckman called for contractor to reschedule for tomorrow
|
Electrical Rough-In | 7/26/2010 | 7/26/2010 | 7/26/2010 | P | PASS |
Doug A Poedy
|
|
|
Rick Phone #: ###-#### >> Inspection requested via web by Rick Beckman
|
Electrical Rough-In | 6/11/2010 | 6/11/2010 | 6/11/2010 | P | PASS |
Bob Reichert
|
|
|
underground Inspection requested from web by: Rick Beckman Phone #: ###-#### correcftions made, ok to cover u/g
|
Electrical Rough-In | 6/10/2010 | 6/11/2010 | 6/11/2010 | A | FAIL |
Bob Reichert
|
|
|
underground electrical Inspection requested from web by: Rick Beckman Phone #: ###-#### called, left correction notice,NEC 310.15(B)2(b) shall maintain spacing between conduit if more than 1 conduit, NOTE: corrections shall be made within 5 working days or further action will be taken
|
Owner Supplied Equipment | | | 6/10/2010 | | |
|
|
|
|
Application received | | | 6/10/2010 | | DONE |
|
|
|
This permit was created on the web by Rick Beckman
|