First Notice | 8/4/2010 | 8/4/2010 | 4/17/2012 | | DONE |
Bob Reichert
|
|
|
|
Final | 8/3/2010 | 8/4/2010 | 8/4/2010 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ok signed structural card
|
Electrical Rough-In | 7/28/2010 | 7/29/2010 | 7/29/2010 | A | PASS |
Bob Reichert
|
|
|
3rd floor cover Phone #: ###-#### >> Inspection requested via web by Tyler Bowen corrections made, ok cover ceilings 3rd and 1st floor
|
Electrical Rough-In | 7/27/2010 | 7/28/2010 | 7/28/2010 | A | FAIL |
Doug A Poedy
|
|
|
3rd floor ceiling cover Phone #: ###-#### >> Inspection requested via web by Tyler Bowen. Many violations. Did walk though with Mitch and p[oint them all out. Need to remove ceiling tiles.
|
Electrical Rough-In | 7/26/2010 | 7/27/2010 | 7/27/2010 | A | FAIL |
Bob Reichert
|
|
|
3rd floor lobby ceiling cover Phone #: ###-#### >> Inspection requested via web by Tyler Bowen ceiling tiles partly up, needs tie wires, box closed, will call when ready
|
Reinspection Fee (no hold) | 7/27/2010 | 7/27/2010 | 7/27/2010 | A | PASS |
Bob Reichert
|
|
|
3rd floor lobby ceiling cover Phone #: ###-#### >> Inspection requested via web by Tyler Bowen see fail
|
Electrical Rough-In | 7/19/2010 | 7/19/2010 | 7/19/2010 | A | PASS |
Bob Reichert
|
|
|
ceiling cover inspection Phone #: ###-#### >> Inspection requested via web by Tyler Bowen 2nd floor ceilings halls ok cover
|
Electrical Rough-In | 6/17/2010 | 6/18/2010 | 6/18/2010 | A | PASS |
Bob Reichert
|
|
|
cover inspection for lobby. Inspection requested from web by: Tyler Bowen Phone #: ###-#### met contractor, ok to cover lobby only
|
Application received | | | 6/17/2010 | | DONE |
|
|
|
This permit was created on the web by Tyler Bowen
|