First Notice | 9/21/2010 | 9/21/2010 | 1/6/2012 | | DONE |
Bob Reichert
|
|
|
|
Final | 9/20/2010 | 9/21/2010 | 9/21/2010 | A | PASS |
Bob Reichert
|
|
|
Final for E-beam tool at bldg.80. Phone #: ###-#### >> Inspection requested via web by Ken Heller ok final
|
Electrical Rough-In | 8/10/2010 | 8/11/2010 | 8/11/2010 | A | PASS |
Bob Reichert
|
|
|
Bob, this was the gutter system you looked at with Ken yesterday. Needed an OK to cover rough in inspection. Paul Cook Phone #: ###-#### >> Inspection requested via web by Paul Cook ri ok
|
Conference | 7/7/2010 | 7/8/2010 | 7/8/2010 | A | DONE |
Bob Reichert
|
|
|
Would like to talk to you about signal cabling running under raised floors in our Fab areas. Article 300.22B, C & D. Paul Cook Inspection requested from web by: Paul Cook Phone #: ###-#### talked about nec for cabling under raised floors per 300 and 645, interpretation does not allow basket type wireways under floor unless all cable plenum rated
|
Application received | | | 7/1/2010 | | DONE |
|
|
|
This permit was created on the web by Paul Cook
|