Final | 10/5/2010 | 10/5/2010 | 10/5/2010 | P | PASS |
Bob Reichert
|
|
|
Developer is going to have equipment room unlocked for access Phone #: ###-#### >> Inspection requested via web by Lynn Cable ok final, no card to sign
|
Electrical Rough-In | 8/13/2010 | 8/13/2010 | 8/13/2010 | P | PASS |
Bob Reichert
|
|
|
potting compound Phone #: ###-#### >> Inspection requested via web by Lynn Cable corrections made, ok potting
|
Electrical Rough-In | 8/12/2010 | 8/13/2010 | 8/13/2010 | A | FAIL |
Bob Reichert
|
|
|
Potting Compound Phone #: ###-#### >> Inspection requested via web by Lynn Cable called, did not cover lugs with potting compound, told to recall when ready
|
Electrical Rough-In | 8/3/2010 | 8/4/2010 | 8/5/2010 | P | CANC |
Bob Reichert
|
|
|
Pool Bonding and underground. Three light niches and 4 brass sleeves, (two inside the pool and two south of the pool in decking) Phone #: ###-#### >> Inspection requested via web by Lynn Cable see response on 8-5-10
|
Electrical Rough-In | 8/5/2010 | 8/5/2010 | 8/5/2010 | A | PASS |
Bob Reichert
|
|
|
pool bonding, u/g and brass sleeves ok to cover
|
Electrical Rough-In | 8/4/2010 | 8/5/2010 | 8/4/2010 | A | CANC |
Bob Reichert
|
|
|
Pool Bonding and underground. Three light niches and 4 brass sleeves, (two inside the pool and two south of the pool in decking) Phone #: ###-#### >> Inspection requested via web by Lynn Cable
|
Application received | | | 8/3/2010 | | DONE |
|
|
|
This permit was created on the web by Lynn Cable
|
First Notice | 10/5/2010 | 10/5/2010 | | | |
Bob Reichert
|
|
|
|