Final | 2/9/2011 | 2/10/2011 | 2/10/2011 | A | PASS |
Bob Reichert
|
|
|
Ray Phone #: ###-#### ok final
|
Final | 2/9/2011 | 2/9/2011 | 2/9/2011 | P | NH |
Bob Reichert
|
|
|
ray Phone #: ###-#### called, left card
|
ELE-Aging Inspection | 12/27/2010 | 12/27/2010 | 12/30/2010 | | DONE |
Bob Reichert
|
|
|
suc
|
Electrical Rough-In | 10/26/2010 | 10/27/2010 | 10/27/2010 | A | PASS |
Bob Reichert
|
|
|
ray Phone #: ###-#### corrections made, ri ok
|
Electrical Rough-In | 10/25/2010 | 10/26/2010 | 10/26/2010 | A | FAIL |
Jack Frank
|
|
|
ray Phone #: ###-#### called corr. posted still needs to provide 6" free length 300.14 , also nailplates note from inside and outside edges of framing members, also equip grd splices not made up tight wires pulled out when I inspected them
|
Reinspection Fee (no hold) | 10/26/2010 | 10/26/2010 | 10/26/2010 | A | PASS |
Jack Frank
|
|
|
ray Phone #: ###-#### 3rd time job has failed
|
Electrical Rough-In | 10/25/2010 | 10/25/2010 | 10/25/2010 | P | FAIL |
Bob Reichert
|
|
|
Ray Phone #: ###-#### called,left correction notice, NEC 300.4(A) (D)edge of bored holes and nm cable shall be 1 1/4 from edge of framing members, 300.14 shall provide 6" free conduitor lenght at boxs 334.30 shall staple nm cable every 4 1/2 ft
|
Electrical Rough-In | 10/21/2010 | 10/22/2010 | 10/22/2010 | A | FAIL |
Doug A Poedy
|
|
|
Ray Phone #: ###-#### Wrong address.
|
Application received | | | 10/21/2010 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/21/2010 | | |
|
|
|
|