VOIDED CHANGE STATUS | | | 4/6/2011 | | DONE |
Tisha Gallop
|
|
|
per phone call from Sam Howell, electrical contractor will be doing work. I told him contractor needs to pull new permit (not transfer this permit), and there is no refund per homeowner handout signed upon permit issuance.
|
ELE-Aging Inspection | 2/28/2011 | 2/28/2011 | 3/2/2011 | | DONE |
Daryl DeGrange
|
|
|
still under construction, new foundation poured with ufer
|
Application received | | | 11/29/2010 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/29/2010 | | DONE |
|
|
|
|