Final | 2/21/2011 | 2/22/2011 | 2/22/2011 | A | PASS |
Jack Frank
|
|
|
Final for Idaho Power easy upgrades job - replacing T12 lamps and ballasts with T8. Thank you! Phone #: ###-#### >> Inspection requested via web by Adam Staigle
|
Electrical Rough-In | 1/28/2011 | 1/28/2011 | 1/28/2011 | P | PASS |
Daryl DeGrange
|
|
|
Process inspection to confirm materials being installed. Phone #: ###-#### >> Inspection requested via web by Adam Staigle ri ok checkec UL listing
|
Application received | | | 1/28/2011 | | DONE |
|
|
|
This permit was created on the web by Adam Staigle
|
First Notice | 2/22/2011 | 2/22/2011 | | | |
Jack Frank
|
|
|
|