First Notice | 5/2/2011 | 5/2/2011 | 7/16/2015 | | DONE |
Doug A Poedy
|
|
|
This permit finaled on the web by Paula Gratiot
|
Final | 5/2/2011 | 5/2/2011 | 5/2/2011 | P | PASS |
Doug A Poedy
|
|
|
|
Electrical Rough-In | 4/28/2011 | 5/2/2011 | 5/2/2011 | A | PASS |
Doug A Poedy
|
|
|
certification for x-ray machine, has talked to Doug Poedy to schedule at 11am//Daniel Mace ###-####. X-ray machine is now listed. DP
|
Final | 4/25/2011 | 4/26/2011 | 4/26/2011 | A | PART |
Jack Frank
|
|
|
This is a partial final request. We are looking for an inspection on the TI with the exception of the x-ray machine which requires a separate inspection since it is used equipment being relocated to this site. Door will be unlocked. Phone #: ###-#### >> Inspection requested via web by Paula Gratiot t/o ok card signed
|
Electrical Rough-In | 3/16/2011 | 3/17/2011 | 3/17/2011 | A | PASS |
Jack Frank
|
|
|
Ready for Rough inspection. Jim will be on site day of inspection. Door should be unlocked. Thanks. Phone #: ###-#### >> Inspection requested via web by Paula Gratiot walls hard ceilings
|
Application received | | | 3/10/2011 | | DONE |
|
|
|
This permit was created on the web by Paula Gratiot
|