Final | 9/2/2011 | 9/2/2011 | 9/2/2011 | P | PASS |
Daryl DeGrange
|
|
|
Jeff Phone #: ###-#### final ok units remaining 103,201,301 unit 101 not included. not part of this remodel
|
Final | 9/1/2011 | 9/1/2011 | 9/1/2011 | P | PART |
Daryl DeGrange
|
|
|
jeff Phone #: ###-#### partial final units 203,303 only
|
Final | 8/31/2011 | 9/1/2011 | 9/1/2011 | A | NR |
Daryl DeGrange
|
|
|
jeff Phone #: ###-####
|
Final | 8/30/2011 | 8/31/2011 | 8/31/2011 | A | NR |
Daryl DeGrange
|
|
|
Neil Phone #: ###-####
|
Permanent Service | 8/15/2011 | 8/15/2011 | 8/15/2011 | P | PASS |
Jack Frank
|
|
|
Jeff Phone #: ###-#### p/s u/g rec. ok
|
Electrical Rough-In | 7/27/2011 | 7/27/2011 | 7/27/2011 | P | PASS |
Daryl DeGrange
|
|
|
jeff Phone #: ###-#### rough-in ok cover second set of apartments--middle units
|
Electrical Rough-In | 7/25/2011 | 7/25/2011 | 7/25/2011 | P | FAIL |
Daryl DeGrange
|
|
|
jeff Phone #: ###-#### NEC 210.11(c) (3) at least one 20 ampere receptacle outlet shall be installed in bathrooms.
|
Electrical Rough-In | 7/13/2011 | 7/13/2011 | 7/13/2011 | P | NR |
Bob Reichert
|
|
|
jeff Phone #: ###-#### needs wiring in stair wells to be done, stapling, nailplates
|
Electrical Rough-In | 6/20/2011 | 6/20/2011 | 6/20/2011 | P | PASS |
Daryl DeGrange
|
|
|
jeff Phone #: ###-#### units 101,201,301- 202,302 rough-in ok cover 201 has a tenant living in it.
|
Electrical Rough-In | 6/16/2011 | 6/17/2011 | 6/17/2011 | P | NR |
Daryl DeGrange
|
|
|
jeff Phone #: ###-####
|
Electrical Rough-In | 6/2/2011 | 6/3/2011 | 6/3/2011 | P | PART |
Daryl DeGrange
|
|
|
Jeff Phone #: ###-#### rough-in ok unit 202 unit 301 unit 303 north stairwell for cover
|
Conference | 5/27/2011 | 5/27/2011 | 5/27/2011 | P | DONE |
Daryl DeGrange
|
|
|
contact name Jeff Phone #: ###-#### >> Inspection requested via web by Neal Rumsey Did walk though with Jeff on job site, Discuss general wire requirements for apartments, box fill,freewire,stapling romex flat. Romex 1 1/4 from framing members edge, 1/2 air gap for recessed cans, from flamable material. receptacle spacing,bedrooms, hallways,countertops.Weather resistant receptacles, inuse covers.
|
Application received | | | 5/19/2011 | | |
|
|
|
|
Issue permit | | | 5/19/2011 | | DONE |
|
|
|
|