Final | 7/6/2011 | 7/7/2011 | 7/7/2011 | A | PASS |
Bob Reichert
|
|
|
should be ready for final also sign off card is in the next door suite Phone #: ###-#### >> Inspection requested via web by Don Lustig ok final, signed card
|
Electrical Rough-In | 7/6/2011 | 7/7/2011 | 7/7/2011 | A | PASS |
Bob Reichert
|
|
|
ceiling grid cover in crapo''s office Phone #: ###-#### >> Inspection requested via web by Don Lustig ok cover ceiling
|
Electrical Rough-In | 6/9/2011 | 6/10/2011 | 6/10/2011 | A | PASS |
Daryl DeGrange
|
|
|
unit will be unlock in am call Cory at the above number will problems, corrections or concerns. this is for wall cover Phone #: ###-#### >> Inspection requested via web by Don Lustig rough-in ok cover walls
|
Application received | | | 5/20/2011 | | DONE |
|
|
|
This permit was created on the web by Don Lustig
|