Final | 6/8/2011 | 6/8/2011 | 6/8/2011 | P | PASS |
Jack Frank
|
|
|
Julian is the electrician. Phone #: ###-#### >> Inspection requested via web by joel smith
|
Final | 6/6/2011 | 6/6/2011 | 6/6/2011 | P | FAIL |
Jack Frank
|
|
|
Julian is the electrician. Phone #: ###-#### >> Inspection requested via web by joel smith called shall not double up neutals with other wires, 250.64 (B) & (E) REC shall be in it's own raceway, and install as code noted states
|
Conference | 5/25/2011 | 5/25/2011 | 5/25/2011 | A | DONE |
Jack Frank
|
|
|
conference on solar
|
Electrical Rough-In | 5/24/2011 | 5/24/2011 | 5/25/2011 | P | PASS |
Jack Frank
|
|
|
Julian is the electrician. Install wiring only for the solar panel. Phone #: ###-#### >> Inspection requested via web by joel smith talked with contr.needs too address GEC,suzi rated disconnects for solar system note owner installing solar frame and panels
|
Application received | | | 5/24/2011 | | DONE |
|
|
|
This permit was created on the web by joel smith
|