Print Statement | | | 2/24/2012 | | DONE |
|
|
|
|
Telephone call | | | 2/2/2012 | | DONE |
Tisha Gallop
|
|
|
called and talked to Zane/Robertson Elec and verified the final value given by the GC was correct. He said original bid was for less work and as time went on the project grew.
|
First Notice | 9/29/2011 | 9/29/2011 | 12/12/2011 | | DONE |
Jack Frank
|
|
|
This permit finaled on the web by Zane Robertson
|
Final | 9/28/2011 | 9/29/2011 | 9/29/2011 | A | PASS |
Jack Frank
|
|
|
Phone #: ###-#### >> Inspection requested via web by Zane Robertson ok no card
|
Final | 9/28/2011 | 9/28/2011 | 9/28/2011 | P | NR |
Bob Reichert
|
|
|
Late afternoon if possible Phone #: ###-#### >> Inspection requested via web by Zane Robertson met contractor, still wiring, said to call for am inspection
|
Electrical Rough-In | 9/20/2011 | 9/20/2011 | 9/20/2011 | P | PASS |
Daryl DeGrange
|
|
|
Ceiling inspection Phone #: ###-#### >> Inspection requested via web by Zane Robertson rough-in ok cover grid
|
Electrical Rough-In | 9/19/2011 | 9/20/2011 | 9/20/2011 | A | NR |
Daryl DeGrange
|
|
|
Ceiling inspection Phone #: ###-#### >> Inspection requested via web by Zane Robertson Not ready for inspection
|
Electrical Rough-In | 9/16/2011 | 9/16/2011 | 9/16/2011 | P | FAIL |
Bob Reichert
|
|
|
Ceiling inspection Phone #: ###-#### >> Inspection requested via web by Zane Robertson met contractor, shall remove all lv wiring not used per NEC 725.25
|
Electrical Rough-In | 9/15/2011 | 9/15/2011 | 9/15/2011 | P | CANC |
Jack Frank
|
|
|
Ceiling inspection late afternoon if possible Phone #: ###-#### >> Inspection requested via web by Zane Robertson Inspection cancelled from web by: Zane Robertson
|
Electrical Rough-In | 6/16/2011 | 6/16/2011 | 6/16/2011 | P | PASS |
Daryl DeGrange
|
|
|
Need the walls approved for cover only Phone #: ###-#### >> Inspection requested via web by Zane Robertson rough-in ok cover walls only
|
Application received | | | 6/2/2011 | | DONE |
|
|
|
This permit was created on the web by Zane Robertson
|