Final | 2/14/2012 | 2/15/2012 | 2/15/2012 | A | PASS |
Daryl DeGrange
|
|
|
Warren Phone #: ###-#### final ok
|
Permanent Service | 7/18/2011 | 7/19/2011 | 7/19/2011 | A | PASS |
Daryl DeGrange
|
|
|
p/s and subpanel -- Power Electric ###-#### p/s ok temp breakers in at this time,need two pole breakers for edison circuits on final
|
Permanent Service | 7/11/2011 | 7/12/2011 | 7/12/2011 | A | NR |
Daryl DeGrange
|
|
|
Waren Phone #: ###-#### stuffing home runs at time of inspection
|
Electrical Rough-In | 7/11/2011 | 7/12/2011 | 7/12/2011 | A | PASS |
Daryl DeGrange
|
|
|
Waren Phone #: ###-#### rough-in ok cover master bedroom and bath. Motorized tub UL listing. branch circuit for floor heat
|
Permanent Service | 6/17/2011 | 6/20/2011 | 6/20/2011 | A | FAIL |
Daryl DeGrange
|
|
|
WARREN PLEASE CALL 30 MIN BEFORE GOING OUT Phone #: ###-#### NEC 250.64(E) Shall use metallic connector listed for grounding & bonding where grounding electrode conductor enters service or use non-metallic connector. Hose clamp isnot a listed grounding connection. Need ultility ground bar.
|
Application received | | | 6/3/2011 | | |
|
|
|
|
Issue & PRINT permit | | | 6/3/2011 | | DONE |
|
|
|
|