Final | 2/3/2012 | 2/3/2012 | 2/3/2012 | P | PASS |
Daryl DeGrange
|
|
|
Electrical contractor done with job,Other electrical contractor taking over job at request of owner. new ele12-00125
|
Issue PAID IN FULL permit | | | 12/7/2011 | | DONE |
|
|
|
Payment received via Govolutions
|
Fees Due Hold | 12/1/2011 | | 12/7/2011 | | DONE |
|
|
|
|
Electrical Rough-In | 11/30/2011 | 12/1/2011 | 12/1/2011 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Neal Rumsey rough-in ok cover Did walk through with electrican and general, pointed out needed corrections as completed so job would pass
|
Rough-In Permanent Service | 11/29/2011 | 11/30/2011 | 11/30/2011 | A | FAIL |
Daryl DeGrange
|
|
|
sched by 415 Was having electrican make corrections as doing inspection walk through on first unit,got beyond 5 violations. NEC 334.30 Shall staple romex within 12 inches of boxes. Not all make ups are completed at time of rough-in inspection,Electrian said well red tag it than!
|
Electrical Rough-In | 7/14/2011 | 7/14/2011 | 7/14/2011 | P | PASS |
Doug A Poedy
|
|
|
jeff Phone #: ###-####. Stairwells and soffet only.
|
Application received | | | 6/29/2011 | | |
|
|
|
|
Override - Parcel Holds | | | 6/29/2011 | | |
|
|
|
|
Issue permit | | | 6/29/2011 | | DONE |
|
|
|
|
First Notice | 2/3/2012 | 2/3/2012 | | | |
Daryl DeGrange
|
|
|
|