Final | 11/13/2011 | 11/18/2011 | 11/18/2011 | A | PASS |
Jack Frank
|
|
|
Cal Phone #: ###-#### >> Inspection requested via web by cal crosby
|
Electrical Rough-In | 8/16/2011 | 8/16/2011 | 8/16/2011 | P | PASS |
Jack Frank
|
|
|
|
Final | 8/16/2011 | 8/16/2011 | 8/16/2011 | P | NR |
Jack Frank
|
|
|
Cal Phone #: ###-#### >> Inspection requested via web by cal crosby see added r/i request
|
Electrical Rough-In | 8/15/2011 | 8/15/2011 | 8/15/2011 | P | FAIL |
Jack Frank
|
|
|
Cal Phone #: ###-#### >> Inspection requested via web by cal crosby address access some j boxes in attic, micro wave circuit, use of SABC recept in cabinet for tv, cu and al spliced with wirenut not listed for cual
|
Application received | | | 8/15/2011 | | DONE |
|
|
|
This permit was created on the web by cal crosby
|