Final | 11/11/2011 | 11/14/2011 | 11/14/2011 | A | PASS |
Jack Frank
|
|
|
Final inspection after power was reconnected and panel finished being labeled per Bob''s request. There is a shed on the side of property with lock box. Code to get key is ARL. Call with any questions. Thanks, Eric Phone #: ###-#### >> Inspection requested via web by Eric Schroeder
|
Permanent Service | 10/27/2011 | 10/27/2011 | 10/27/2011 | A | PASS |
Bob Reichert
|
|
|
Reinspect after supplemental grounding installed. After power is connected, will label panel and call for final as per Bob''s request. For access, there is a lock box on shed of property. Access code is ARL. Call with any questions or concerns. Thanks, Eric Phone #: ###-#### >> Inspection requested via web by Eric Schroeder corrections made p/s o/h rec ok
|
Permanent Service | 10/27/2011 | 10/27/2011 | 10/27/2011 | A | CANC |
Jack Frank
|
|
|
Reinspect after adding supplemental grounding by driving 2 ground rods. After power is connected, will label panel and call in for final as per Bob''s request. Please call ###-#### with any questions or problems. Thanks, Eric Phone #: ###-#### >> Inspection requested via web by Eric Schroeder Inspection cancelled from web by: Eric Schroeder
|
Permanent Service | 10/18/2011 | 10/18/2011 | 10/18/2011 | P | FAIL |
Bob Reichert
|
|
|
Inspect for Idaho Power to reconnect. There is a lock box on the adjacent shed. Code for lock box is ARL. Call with any questions. Thanks, Eric Phone #: ###-#### >> Inspection requested via web by Eric Schroeder grounding not per code, called contractor to explain that he needs 2 trips, one p/s and one for final
|
Issue PAID IN FULL permit | | | 10/18/2011 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/18/2011 | | DONE |
|
|
|
This permit was created on the web by Eric Schroeder
|