Final | 2/29/2012 | 3/1/2012 | 3/1/2012 | P | PASS |
Doug A Poedy
|
|
|
Cal Phone #: ###-#### >> Inspection requested via web by cal crosby
|
Final | 2/24/2012 | 2/24/2012 | 2/24/2012 | P | FAIL |
Daryl DeGrange
|
|
|
Cal Phone #: ###-#### NEC 250.24 The grounded conductor (neutral) from an 4 wire branch circuit shall orginate from the grounding bar along with the equipment grounding conductor. NEC250.32(A) Buildings supplied by feeders or branch circuits shall have a grounding eletrode.NEC 250.56 A single electode consisting of a rod pipe, or plate that does not have a resistance of 25 ohms or less shall be argmented by an additional electrode NEC 300.4 Shall provide nail plates were NM cable or bored holes are less than 1 1/4 from edge of framing member
|
Conference | 11/9/2011 | 11/9/2011 | 11/9/2011 | P | CANC |
Bob Reichert
|
|
|
I need a trinch inspection only Please Trinch is in back call for any Questions Phone #: ###-#### >> Inspection requested via web by cal crosby see ri
|
Electrical Rough-In | 11/9/2011 | 11/9/2011 | 11/9/2011 | P | PASS |
Bob Reichert
|
|
|
ok cover u/g only
|
Issue PAID IN FULL permit | | | 11/9/2011 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/9/2011 | | DONE |
|
|
|
This permit was created on the web by cal crosby
|