Final | 2/9/2012 | 2/10/2012 | 2/10/2012 | A | PASS |
Daryl DeGrange
|
|
|
John will take you around to look at all of the work we have done on three permits. Phone #: ###-#### >> Inspection requested via web by Kevin Perez final ok
|
Electrical Rough-In | 12/15/2011 | 12/16/2011 | 12/16/2011 | A | PASS |
Daryl DeGrange
|
|
|
Please inspect the temporary outlets we installed. Call Jeremy ###-####. Phone #: ###-#### >> Inspection requested via web by Kevin Perez rough-in ok temp 240 volt 50 ampere twist lock receptacles
|
Final | 12/15/2011 | 12/15/2011 | 12/15/2011 | P | CANC |
Doug A Poedy
|
|
|
Please inspect the temporary outlets we installed. Call Jeremy ###-####. Phone #: ###-#### >> Inspection requested via web by Kevin Perez. Rescheduled to 12-16. Nobody there to open doors.
|
Issue PAID IN FULL permit | | | 12/13/2011 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/13/2011 | | DONE |
|
|
|
This permit was created on the web by Kevin Perez
|
First Notice | 2/10/2012 | 2/10/2012 | | | |
Daryl DeGrange
|
|
|
|