ELE-Aging Inspection | 6/17/2013 | 6/17/2013 | 6/25/2013 | | DONE |
Daryl DeGrange
|
|
|
see final
|
Final | 6/18/2013 | 6/25/2013 | 6/25/2013 | P | PASS |
Daryl DeGrange
|
|
|
requests after 2 pm * Heather Phone #: ###-#### job complete final ok
|
Permanent Service | 3/27/2012 | 3/27/2012 | 3/27/2012 | P | PASS |
Daryl DeGrange
|
|
|
p/s u/g rec ok
|
Permanent Service | 3/26/2012 | 3/26/2012 | 3/26/2012 | P | FAIL |
Daryl DeGrange
|
|
|
Heather//please call when done Phone #: ###-#### Service entrance conduit replaced with schedule 40,rather than schedule 80 as required per NEC 352.12 Uses not permited where subject to physical damage (RV pad)
|
Permanent Service | 3/20/2012 | 3/22/2012 | 3/22/2012 | P | FAIL |
Daryl DeGrange
|
|
|
###-#### or cell ###-#### call 30 minutes in advance. Please after 3 pm. As per Doug Poedy service entrance conduit connector at service meter,has been pulled apart from settling concrete RV pad. Replace connector and add slip joint , call back in for reinspection for permanent service
|
Conference | 3/13/2012 | 3/15/2012 | 3/15/2012 | P | DONE |
Jack Frank
|
|
|
Heather-Please call at least 30 mins prior to inspection Phone #: ###-#### explained code requirements for reconnect of p/s
|
Application received | | | 3/13/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/13/2012 | | DONE |
Barbara Stitt
|
|
|
|