Final | 6/14/2012 | 6/14/2012 | 6/14/2012 | P | PASS |
Jack Frank
|
|
|
aaron Phone #: ###-#### final ok
|
Final | 6/11/2012 | 6/11/2012 | 6/11/2012 | P | CANC |
Bob Reichert
|
|
|
Aaron Phone #: ###-#### called, asked owner to re-schedule
|
Final | 6/4/2012 | 6/4/2012 | 6/4/2012 | P | FAIL |
Jack Frank
|
|
|
Chis Phone #: ###-#### met owner explained violations
|
Electrical Rough-In | 5/21/2012 | 5/22/2012 | 5/22/2012 | A | PASS |
Jack Frank
|
|
|
r/i and potting of bond terminal at pool light ok
|
Electrical Rough-In | 5/21/2012 | 5/21/2012 | 5/21/2012 | P | CANC |
Jack Frank
|
|
|
Aaron-encapulsation inspection for pool light please Phone #: ###-#### see added r/i for 05-22-12 AM
|
Electrical Rough-In | 4/23/2012 | 4/24/2012 | 4/24/2012 | P | PASS |
Jack Frank
|
|
|
Christopher Phone #: ###-#### u/g conduit and pool bond ok
|
Conference | 4/10/2012 | 4/12/2012 | 4/12/2012 | A | DONE |
Jack Frank
|
|
|
Christopher-Please call at least 20 mins prior to inspection Phone #: ###-####
|
Application received | | | 4/9/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/9/2012 | | DONE |
|
|
|
|