Final | 7/11/2012 | 7/11/2012 | 7/11/2012 | P | PASS |
Jack Frank
|
|
|
warren after 2 if possible Phone #: ###-#### ok
|
Electrical Rough-In | 5/8/2012 | 5/9/2012 | 5/9/2012 | A | PASS |
Bob Reichert
|
|
|
Warren Phone #: ###-#### ok cover u/g
|
Electrical Rough-In | 4/30/2012 | 5/1/2012 | 5/1/2012 | P | PASS |
Bob Reichert
|
|
|
warren( trench inspection) Phone #: ###-#### ok cover u/g at drive area
|
Application received | | | 4/11/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/11/2012 | | DONE |
|
|
|
|
First Notice | 7/11/2012 | 7/11/2012 | | | |
Jack Frank
|
|
|
|