Final | 1/5/2014 | 1/6/2014 | 1/6/2014 | P | PASS |
Daryl DeGrange
|
|
|
please call prior Cory ###-#### Phone #: ###-#### >> Inspection requested via web by cory carman correction done, final ok
|
ELE-Aging Inspection | 12/31/2013 | 12/31/2013 | 1/3/2014 | | DONE |
Daryl DeGrange
|
|
|
contacted contractor by phone, He said he would call for final monday 1/06/14
|
ELE-Aging Inspection | 9/20/2013 | 9/20/2013 | 9/20/2013 | | DONE |
Daryl DeGrange
|
|
|
Called, with message with contractor, need to schedule final inspection
|
Final | 9/28/2012 | 9/28/2012 | 9/28/2012 | P | FAIL |
Doug A Poedy
|
|
|
Phone #: ###-#### >> Inspection requested via web by cory carman. GFCI protection for pools light and pumps.
|
Electrical Rough-In | 5/22/2012 | 5/22/2012 | 5/22/2012 | P | PASS |
Jack Frank
|
|
|
hot tub bonding grid Phone #: ###-#### >> Inspection requested via web by cory carman ok
|
Final | 5/21/2012 | 5/22/2012 | 5/22/2012 | A | CANC |
Jack Frank
|
|
|
they are pouring a pad around pool I attached a bond wire to the necessary cups for a hand rail Phone #: ###-#### >> Inspection requested via web by cory carman
|
Electrical Rough-In | 5/22/2012 | 5/22/2012 | 5/22/2012 | A | PART |
Jack Frank
|
|
|
they are pouring a pad around pool I attached a bond wire to the necessary cups for a hand rail Phone #: ###-#### >> Inspection requested via web by cory carman pool bonding ok still needs to bond spa area
|
Issue PAID IN FULL permit | | | 5/21/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/21/2012 | | DONE |
|
|
|
This permit was created on the web by cory carman
|