First Notice | 12/18/2013 | 12/18/2013 | 5/15/2020 | | DONE |
Rock A. Hudson
|
|
|
This permit finaled on the web by Deb Gooden
|
First Notice | 7/12/2012 | 7/12/2012 | 5/15/2020 | | DONE |
Daryl DeGrange
|
|
|
This permit finaled on the web by Deb Gooden
|
Final | 12/18/2013 | 12/18/2013 | 12/18/2013 | P | PASS |
Rock A. Hudson
|
|
|
###-#### Core and shell all boxes have been cover and protected. Corrections complete. Final ok
|
Final | 12/18/2013 | 12/18/2013 | 12/18/2013 | P | FAIL |
Rock A. Hudson
|
|
|
###-#### 314.25- Elevator lobbies floors 8, 13, 15, 16, 17, 5th floor parking garage, 2nd floor ceiling boxes shall be covered. 408.4 Circuit directories for floors 1, 9 need completed.
|
Final | 12/17/2013 | 12/18/2013 | 12/18/2013 | A | PART |
Rock A. Hudson
|
|
|
Contact: Wes Powell Phone #: ###-#### >> Inspection requested via web by Deb Gooden All baths, all south stair, 3, 4, 5, parking garages, electrical rooms 2 thru 9 and 11 to penthouse, Final ok
|
Final | 12/13/2013 | 12/13/2013 | 12/13/2013 | P | PART |
Rock A. Hudson
|
|
|
North stair basement to 17 ok, bathrooms 6,8 to 17 ok, basement ok, Pent house ok
|
Final | 12/13/2013 | 12/13/2013 | 12/13/2013 | P | FAIL |
Rock A. Hudson
|
|
|
408.4-Circuit directories shall be installed on all panels. 400.8-Flexible cord to plug strip shall not be installed as permanent wiring. 110.3- Installation not complete. South stair light on 17th floor not installed
|
Electrical Rough-In | 12/13/2013 | 12/13/2013 | 12/13/2013 | P | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell.. ceiling inspection and partial final please Phone #: ###-#### >> Inspection requested via web by Deb Gooden 1st floor main entrance ceiling grid inspection rough in ok cover
|
Final | 12/12/2013 | 12/12/2013 | 12/12/2013 | P | FAIL |
Rock A. Hudson
|
|
|
406.5- All faceplate shall be installed. 110.7- Electrical installation shall be complete on floor 1 and 2 main entrances. 406.5 Parking garages have missing covers on boxes which shall be installed.
|
Electrical Rough-In | 12/9/2013 | 12/9/2013 | 12/9/2013 | P | FAIL |
Rock A. Hudson
|
|
|
Contact: Wes Powell - Partial final inspection plese Phone #: ###-#### >> Inspection requested via web by Deb Gooden 110.26(A)(1)- Minimum work space shall be provided 36"deep and 30" wide. Panel L10LS. 330.30(B)- MC cable shall be secured at intervals not to exceed 6' and with in 12" of box or fitting. Parking garages on floors 3, 4, 5.
|
Electrical Rough-In | 12/5/2013 | 12/5/2013 | 12/5/2013 | P | PART |
Rock A. Hudson
|
|
|
Contact: Wes Powell.. Partial final inspection please Phone #: ###-#### >> Inspection requested via web by Deb Gooden Baths on floors 7, 8, 11, 15, 16, 17 Final ok
|
Final | 12/4/2013 | 12/4/2013 | 12/4/2013 | P | PART |
Rock A. Hudson
|
|
|
Core and shell by floor Wes ###-#### or Jeromy ###-#### Bath and shower room floors 6, 9, 10, 12, 13, 14, final ok
|
Final | 12/4/2013 | 12/4/2013 | 12/4/2013 | P | PART |
Rock A. Hudson
|
|
|
6th floor baths and elevator lobby final ok
|
Electrical Rough-In | 12/3/2013 | 12/3/2013 | 12/3/2013 | P | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell Ceiling inspection please Phone #: ###-#### >> Inspection requested via web by Deb Gooden North alley way hard lid rough in ok cover
|
Electrical Rough-In | 11/20/2013 | 11/20/2013 | 11/20/2013 | P | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell, ceiling inspection please Phone #: ###-#### >> Inspection requested via web by Deb Gooden Floor 3, 4, 5, elevator lobby ceiling rough in ok cover
|
Permanent Service | 11/14/2013 | 11/15/2013 | 11/15/2013 | A | PART |
Rock A. Hudson
|
|
|
Contact: Wes Powell Phone #: ###-#### >> Inspection requested via web by Deb Gooden Fire pump, and generator rough in ok
|
Electrical Rough-In | 11/5/2013 | 11/6/2013 | 11/6/2013 | A | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell. ceiling inspection please Phone #: ###-#### >> Inspection requested via web by Deb Gooden 2nd floor ceiling over escalator grid and hard lid rough in ok cover
|
Electrical Rough-In | 10/29/2013 | 10/29/2013 | 10/29/2013 | P | PASS |
Rock A. Hudson
|
|
|
Contact: Frank Yantis - underground inspection please Phone #: ###-#### >> Inspection requested via web by Deb Gooden South under ground for 2 street lights rough in ok cover
|
Electrical Rough-In | 10/28/2013 | 10/29/2013 | 10/29/2013 | A | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell. ceiling inspection please Phone #: ###-#### >> Inspection requested via web by Deb Gooden South under ground for 2 street lights, elevator loby ceilings on floors 2, 6, 7, 9, 10, 11, 12 rough in ok cover
|
Permanent Service | 10/10/2013 | 10/10/2013 | 10/10/2013 | P | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell Phone #: ###-#### >> Inspection requested via web by Deb Gooden Fire pump service p/s u/g n ok
|
Electrical Rough-In | 9/26/2013 | 9/26/2013 | 9/26/2013 | P | PART |
Rock A. Hudson
|
|
|
Contact: Wes Powell Phone #: ###-#### >> Inspection requested via web by Deb Gooden Preliminary penthouse HVAC, chillers, water pumps, cable tray, stair hard lid rough in ok cover
|
Electrical Rough-In | 9/25/2013 | 9/25/2013 | 9/25/2013 | P | NH |
Rock A. Hudson
|
|
|
Contact: Wes Powell Phone #: ###-#### >> Inspection requested via web by Deb Gooden Contractor had left for day will reschedule
|
Electrical Rough-In | 9/18/2013 | 9/19/2013 | 9/19/2013 | A | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell, wall inspection please Phone #: ###-#### >> Inspection requested via web by Deb Gooden Basement fire room walls rough in ok cover
|
Electrical Rough-In | 9/12/2013 | 9/13/2013 | 9/13/2013 | P | PASS |
Rock A. Hudson
|
|
|
wall rough in inspection please. contact name Wes Powell. Thank you. Phone #: ###-#### >> Inspection requested via web by Deb Gooden 17th floor elevator lobby walls, 1st floor N.E. out soffit rough in ok cover
|
Electrical Rough-In | 9/11/2013 | 9/11/2013 | 9/11/2013 | P | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell Phone #: ###-#### >> Inspection requested via web by Deb Gooden Floors 14, 15, 16 elevator lobby rough in ok cover
|
Electrical Rough-In | 9/10/2013 | 9/11/2013 | 9/11/2013 | A | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell. wall rough-in please Phone #: ###-#### >> Inspection requested via web by Deb Gooden Bath lobby ceilings floors 14, 15, 16, 17. rough in ok cover
|
Electrical Rough-In | 9/5/2013 | 9/5/2013 | 9/5/2013 | P | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell. wall rough in please Phone #: ###-#### >> Inspection requested via web by Deb Gooden Elevator lobby walls floors 9, 10, 12, 13. Rough in ok cover
|
Electrical Rough-In | 8/26/2013 | 8/26/2013 | 8/26/2013 | A | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell. wall rough-in please Phone #: ###-#### >> Inspection requested via web by Deb Gooden Elevator lobby walls floors 2 thru 6 rough in ok cover
|
Electrical Rough-In | 8/23/2013 | 8/23/2013 | 8/23/2013 | P | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell Phone #: ###-#### >> Inspection requested via web by Deb Gooden 1st floor elevator lobby walls rough in ok cover
|
Electrical Rough-In | 7/22/2013 | 7/23/2013 | 7/23/2013 | A | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell Phone #: ###-#### >> Inspection requested via web by Deb Gooden Main floor corridor ceilings 109,118,119,and partial 113 from elevator lobby to north stair. Penthouse walls marked on contractors print. Rough in ok cover
|
Electrical Rough-In | 7/10/2013 | 7/10/2013 | 7/10/2013 | A | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell Phone #: ###-#### >> Inspection requested via web by Deb Gooden Wall rough in 18th floor as noted on contractors print rough in ok cover
|
Electrical Rough-In | 7/1/2013 | 7/1/2013 | 7/1/2013 | P | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell Phone #: ###-#### >> Inspection requested via web by Deb Gooden Upper floor as noted on contractors print wall rough in ok cover
|
Permanent Service | 6/27/2013 | 6/27/2013 | 6/27/2013 | P | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell..... early if possible please Phone #: ###-#### >> Inspection requested via web by Deb Gooden Contractor to order groundfault performance test per NEC 230.95(C). p/s u/g n ok
|
Electrical Rough-In | 6/13/2013 | 6/14/2013 | 6/14/2013 | A | PASS |
Rock A. Hudson
|
|
|
Wes Powell Phone #: ###-#### 17th floor bath walls and ceiling rough in ok cover
|
Override - Parcel Holds | 6/13/2013 | 1/1/1900 | 6/13/2013 | | |
|
|
|
Not in the plan modification area
|
Electrical Rough-In | 6/10/2013 | 6/10/2013 | 6/10/2013 | P | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell - wall rough-in please Phone #: ###-#### >> Inspection requested via web by Deb Gooden North stairs floors 15&16, Floor 16 bathrooms rough in ok cover
|
Electrical Rough-In | 6/5/2013 | 6/5/2013 | 6/5/2013 | P | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell Phone #: ###-#### >> Inspection requested via web by Deb Gooden 17th floor north stair, 15th bath rough in ok cover
|
Electrical Rough-In | 5/28/2013 | 5/28/2013 | 5/28/2013 | P | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell Phone #: ###-#### >> Inspection requested via web by Deb Gooden South stair floors 15 thru 17 rough in ok cover
|
Electrical Rough-In | 5/21/2013 | 5/22/2013 | 5/22/2013 | A | PASS |
Rock A. Hudson
|
|
|
Contact: Jesse Busack Phone #: ###-#### >> Inspection requested via web by Deb Gooden Preliminary inspection on transformers for each floor
|
Electrical Rough-In | 5/20/2013 | 5/21/2013 | 5/21/2013 | P | CANC |
Doug A Poedy
|
|
|
Contact: Jesse Busack Phone #: ###-#### >> Inspection requested via web by Deb Gooden. Rescheduled
|
Conference | 5/1/2013 | 5/2/2013 | 5/2/2013 | A | DONE |
Rock A. Hudson
|
|
|
Conference with the inspector please. Your contact name will be Jesse Busack. Thank You. Phone #: ###-#### >> Inspection requested via web by Deb Gooden Discussed UL listed cables for fire pump emergency power. NEC 2008 handbook provided other options to explore
|
Electrical Rough-In | 4/29/2013 | 4/29/2013 | 4/29/2013 | P | PASS |
Rock A. Hudson
|
|
|
wes Phone #: ###-#### Floors11 thru 14 South stairs and baths. Floors 12 thru 14 stair and baths.
|
Electrical Rough-In | 4/15/2013 | 4/15/2013 | 4/15/2013 | A | PASS |
Bob Reichert
|
|
|
Contact: Wes power Phone #: ###-#### >> Inspection requested via web by Deb Gooden North stairs, baths,Floor 7-11, South stairs, baths,Floor 7-10
|
Electrical Rough-In | 4/9/2013 | 4/9/2013 | 4/9/2013 | P | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell - wall rough-in please Phone #: ###-#### >> Inspection requested via web by Deb Gooden Bathrooms floors 2-6-7-8 rough in ok cover
|
Electrical Rough-In | 3/6/2013 | 3/7/2013 | 3/7/2013 | P | PASS |
Rock A. Hudson
|
|
|
Contact: Wes Powell Phone #: ###-#### >> Inspection requested via web by Deb Gooden Stair wells north and south up to 6th floor and basement walls rough in ok cover
|
Electrical Rough-In | 3/5/2013 | 3/6/2013 | 3/6/2013 | P | FAIL |
Rock A. Hudson
|
|
|
Contact: Wes Powell, wall rough-in inspection please Phone #: ###-#### >> Inspection requested via web by Deb Gooden NEC 330.17 Where MC cable running through framing members shall be protected from physical damage in accordance with 300.4. NEC 330.24 (B) Bends in MC cable shall be made so that the cable will not be damaged. NEC 110.26 (F)(1) Indoor dedicated electrical space equal to the width and depth of the equiptment extending 6' above equiptment. Duct work located with in space. Dry wall installed on 1st floor of electrical room before inspection was performed
|
Electrical Rough-In | 10/31/2012 | 11/1/2012 | 11/1/2012 | A | PASS |
Bob Reichert
|
|
|
Contact: Jon Starke underground insepction please Phone #: ###-#### >> Inspection requested via web by Deb Gooden ok cover u/g communications ne corner only, contractor states conduit will be concrete encased
|
Electrical Rough-In | 10/11/2012 | 10/12/2012 | 10/12/2012 | A | PASS |
Rock A. Hudson
|
|
|
Contact: Jon Starke - underground inspection please Phone #: ###-#### >> Inspection requested via web by Deb Gooden Rest of basement under ground rough in ok cover
|
Electrical Rough-In | 10/5/2012 | 10/5/2012 | 10/5/2012 | P | PASS |
Daryl DeGrange
|
|
|
Contact: Jon Starke underground inspection please Phone #: ###-#### >> Inspection requested via web by Deb Gooden rough-in cover underground (duct bank) under north alley
|
Electrical Rough-In | 9/27/2012 | 9/27/2012 | 9/27/2012 | P | PART |
Doug A Poedy
|
|
|
Contact: Jon Starke Grounding & underground inspections please Phone #: ###-#### >> Inspection requested via web by Deb Gooden
|
Electrical Rough-In | 8/16/2012 | 8/16/2012 | 8/16/2012 | P | PASS |
Daryl DeGrange
|
|
|
Contact: Jon Starke - underground inspection please Phone #: ###-#### >> Inspection requested via web by Deb Gooden rough-in ok cover underground service feeders
|
Temporary Service | 8/6/2012 | 8/6/2012 | 8/6/2012 | P | CANC |
Daryl DeGrange
|
|
|
Contact: Jon Starke Phone #: ###-#### >> Inspection requested via web by Deb Gooden
|
Electrical Rough-In | 8/3/2012 | 8/6/2012 | 8/6/2012 | A | PASS |
Daryl DeGrange
|
|
|
Contact: Jon Starke underground inspection please Phone #: ###-#### >> Inspection requested via web by Deb Gooden rough-in ok cover in concrete primary service feeder conduits N.E corner
|
Change Status to I | | | 8/3/2012 | | |
|
|
|
8-3-12 changed back to issue as it was finaled by mistake ///dld
|
Temporary Service | 7/11/2012 | 7/12/2012 | 7/12/2012 | P | PASS |
Daryl DeGrange
|
|
|
Contact: Jon Starke Phone #: ###-#### >> Inspection requested via web by Deb Gooden t/s u/g n ok
|
Issue PAID IN FULL permit | | | 7/11/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/11/2012 | | DONE |
|
|
|
This permit was created on the web by Deb Gooden
|