Final | 5/5/2015 | 5/6/2015 | 5/6/2015 | A | PASS |
Bob Reichert
|
|
|
Darin Phone #: ###-#### ok final
|
ELE-Aging Inspection | 3/31/2015 | 3/31/2015 | 3/31/2015 | | DONE |
Bob Reichert
|
|
|
still under construction
|
ELE-Aging Inspection | 12/30/2014 | 12/30/2014 | 12/30/2014 | | DONE |
Bob Reichert
|
|
|
called to set up final
|
ELE-Aging Inspection | 9/30/2014 | 9/30/2014 | 10/7/2014 | | CANC |
Bob Reichert
|
|
|
|
ELE-Aging Inspection | 6/27/2014 | 6/27/2014 | 7/1/2014 | | CANC |
Bob Reichert
|
|
|
|
Electrical Rough-In | 3/28/2014 | 3/28/2014 | 3/28/2014 | P | PASS |
Rex Boyles
|
|
|
Darrin Phone #: ###-#### rough in ok to cover make up done
|
Final | 3/27/2014 | 3/28/2014 | 3/28/2014 | A | FAIL |
Rex Boyles
|
|
|
Darin Phone #: ###-#### grounds or wiring not made up needed rough in insp
|
(F) Reprint permit | | | 2/6/2014 | | DONE |
Barbara Stitt
|
|
|
|
Electrical Rough-In | 2/28/2013 | 3/1/2013 | 3/1/2013 | A | PASS |
Rock A. Hudson
|
|
|
Darin Phone #: ###-#### Kitchen and basement entertain wall rough in ok cover
|
(F) Reprint permit | | | 2/1/2013 | | DONE |
|
|
|
|
Electrical Rough-In | 12/10/2012 | 12/10/2012 | 12/10/2012 | P | PASS |
Rock A. Hudson
|
|
|
Darren Phone #: ###-#### 2nd bathroom rough in ok cover
|
Electrical Rough-In | 8/29/2012 | 8/30/2012 | 8/30/2012 | A | PASS |
Daryl DeGrange
|
|
|
Darin Phone #: ###-#### rough-in ok cover remodel of bedrooms and utility room
|
Permanent Service | 8/21/2012 | 8/22/2012 | 8/22/2012 | A | PASS |
Daryl DeGrange
|
|
|
Darin Phone #: ###-#### p/s o/h rec ok
|
Electrical Rough-In | 8/17/2012 | 8/21/2012 | 8/21/2012 | P | NR |
Daryl DeGrange
|
|
|
Darin- if possible around 3ish Phone #: ###-####
|
Conference | 8/9/2012 | 8/10/2012 | 8/10/2012 | A | PASS |
Daryl DeGrange
|
|
|
call 1/2 before//darin Phone #: ###-#### Discuss with homeowner requirements for single family remodel complete with service upgrade
|
Application received | | | 8/9/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/9/2012 | | DONE |
|
|
|
|