Final | 2/18/2013 | 2/19/2013 | 2/19/2013 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by steve sellers Final ok
|
Rough-In Permanent Service | 10/19/2012 | 10/19/2012 | 10/19/2012 | P | PASS |
Daryl DeGrange
|
|
|
p/s and cover for floor heat//Steve Phone #: ###-#### rough-in floor heat p/s o/h rec ok
|
Permanent Service | 10/19/2012 | 10/19/2012 | 10/19/2012 | A | FAIL |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by steve sellers Two ground rods at least 6 ft apart. concrete encased electrode can not be exsposed to the elements (rebar)
|
Electrical Rough-In | 10/19/2012 | 10/19/2012 | 10/19/2012 | A | FAIL |
Daryl DeGrange
|
|
|
floor heat inspection in master bath and main bathroom Phone #: ###-#### >> Inspection requested via web by steve sellers NEC 110.3(B) Floor heat not installed in accordance with manufactors instructions
|
Electrical Rough-In | 9/12/2012 | 9/13/2012 | 9/13/2012 | A | PASS |
Daryl DeGrange
|
|
|
steve Phone #: ###-#### rough-in ok cover
|
Issue PAID IN FULL permit | | | 9/12/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/12/2012 | | DONE |
|
|
|
This permit was created on the web by steve sellers
|