Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberELE12-02735
StatusFinaled
Name ENTERPRISE ELECTRIC
Site Address 1055 N CURTIS RD
Project Name 
Customer NumberC-12132
ePlanReviewNo
Description
Electrical Permit - Alteration: Remodel ED
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice10/2/201410/2/201410/30/2015 DONE
DetailsRock A. Hudson
This permit finaled on the web by Clint Tate
First Notice2/3/20142/3/201410/30/2015 DONE
DetailsDaryl DeGrange
This permit finaled on the web by Clint Tate
Print Statement  9/4/2015 DONE
Print Statement  12/15/2014 DONE
DetailsCandy A. Nichols
ELE-Aging Inspection10/2/201410/2/201410/2/2014 DONE
DetailsRock A. Hudson
Completed at phase 3 inspection
Final10/2/201410/2/201410/2/2014PPASS
DetailsRock A. Hudson
Final ok
Final6/27/20147/1/20146/30/2014ACANC
DetailsRock A. Hudson
We are requesting a Fire Alarm inspection for Tuesday July 1st in the am. Our onsite contact is Bryant Adams @ ###-####. Thanks. Phone #: ###-#### >> Inspection requested via web by Clint Tate Electrical does not inspect final for fire
Final6/27/20146/30/20146/30/2014APART
DetailsRock A. Hudson
We are requesting a final electrical inspection for Monday, June 30th in the am. Our onsite contact is Bryant Adams @ ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Clint Tate Phase 3 ER remodel final ok
Final6/27/20146/30/20146/27/2014ACANC
DetailsRock A. Hudson
We are requesting a final inspection for Monday June 30th in the am. Our onsite contact is Bryant Adams @ ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Clint Tate Inspection cancelled from web by: Clint Tate
Electrical Rough-In6/23/20146/23/20146/23/2014PPASS
DetailsRock A. Hudson
ER phase 3 ceiling grid rough in ok cover
Rough-In Permanent Service6/20/20146/23/20146/23/2014APART
DetailsRock A. Hudson
We are requesting a ceiling inspection for the morning of Monday, June 23rd. Our onsite contact is Bryant Adams @ ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Clint Tate No service needed Exits siezmic, mini cans in circle, open junctions, couple offices with wires shot not connected to fixures. Borders only ok cover
Electrical Rough-In6/20/20146/23/20146/20/2014PCANC
DetailsRock A. Hudson
We are requesting a Ceiling inspection for Monday, June 23rd in the afternoon. Our onsite contact is Bryant Adams ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Clint Tate Inspection cancelled from web by: Clint Tate
Conference6/18/20146/18/20146/18/2014PDONE
DetailsRock A. Hudson
We are requesting an electrical consult for today June 18th in the aftermoon. Our onsite contact is Bryant Adams @ ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Clint Tate Discussed direct burial depth under ambulance cover, due to vehicle access 24" minimum cover required but due to solid concrete bases note 5 to 300.5 states shallower depth acceptable if encased in min of 2" concrete.
Final5/14/20145/15/20145/15/2014APART
DetailsRock A. Hudson
We are requesting a final inspection for the ED Trauma & Resuscitation area. (Please do not close this permit -project is on-going) For tomorrow 5/15/14 in the AM our onsite contact is Bud @ ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Clint Tate Area specified final ok
Electrical Rough-In5/7/20145/8/20145/8/2014APART
DetailsRock A. Hudson
We are requesting a partial ceiling inspection for tomorrow 5/8/14 during the AM. Our onsite contact is Bud @ ###-####. Thank you. Phone #: ###-#### >> Inspection
requested via web by Clint Tate Corridor grid by east trauma rooms rough in ok cover
Electrical Rough-In4/24/20144/25/20144/25/2014APASS
DetailsRock A. Hudson
We are requesting a wall rough-in inspection for tomorrow 4/25/14 in the AM. Our onsite contact is Bud Horsley @ ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Clint Tate Physicians lounge, corridor, baths, family counselling, utility linen wall rough in ok cover
Electrical Rough-In4/10/20144/11/20144/11/2014PPASS
DetailsRock A. Hudson
We are requesting a wall rough in inspection for tomorrow 4/11/14 in the afternoon. Our onsite contact is Bud @ ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Clint Tate Phase 3 ER panel wall, bathroom walls and lids, Med room, rescorce room Desk area, Nurse desk, and soiled and clean lennon rooms wall and bath lids rough in ok cover
Electrical Rough-In4/1/20144/2/20144/2/2014APASS
DetailsRock A. Hudson
We are requesting a partial wall rough-in inspection for tomorrow 4/2/14 in the AM. Our onsite contact is Bud @ ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Clint Tate Phase 3 all exam rooms wall rough in ok cover
Conference4/1/20144/1/20144/1/2014PDONE
DetailsRock A. Hudson
We are requesting a electrical consultation with a city of inspector for today about the sheet rock in front of the exam rooms. Our onsite contact is Bud ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Clint Tate Discussed covering upper wall by exam rooms for cable tray installation. Cover ok
Electrical Rough-In3/19/20143/20/20143/20/2014APASS
DetailsRock A. Hudson
We are requesting a wall rough-in inspection for tomorrow 3/20/14 in the AM for Trauma/ Resuscitation. Our onsite contact is Bud ###-####. This is an on-going project please leave this permit open. Thank you. Phone #: ###-#### >> Inspection requested via web by Clint Tate Wall rough in ok cover
Final2/18/20142/19/20142/19/2014ACANC
DetailsDaryl DeGrange
bud on site contact (This permit received a final by mistake this is an on going permit.) Phone #: ###-#### should of been scheduled as rough-in
Electrical Rough-In2/19/20142/19/20142/19/2014APASS
DetailsDaryl DeGrange
bud on site contact (This permit received a final by mistake this is an on going permit.) Phone #: ###-#### Rough-in ok cover underground phase 3 nurses call
Change Status to I  2/18/2014  
This permit received a final by mistake this is an on going permit .
Final1/30/20142/3/20142/3/2014APASS
DetailsDaryl DeGrange
We are requesting Final Inspection for CCD 016 Soiled Linen SARMC for Monday Feb. 3rd in the AM. Our onsite contact is Bud Horsely 208.369.7770. Thank you. Phone #: ###-#### >> Inspection requested via web by Clint Tate job complete, final ok
Electrical Rough-In1/14/20141/15/20141/15/2014APASS
DetailsDaryl DeGrange
Bud needs a rough-in inspection for CCD-016 soiled linen at SARMC. Bud can be reached at ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Clint Tate rough-in ok cover walls and hard lid
Permanent Service12/23/201312/24/201312/24/2013ACANC
DetailsDaryl DeGrange
Bud on site. Final for Phase 2B and staff lounge. Phone #: ###-#### >> Inspection requested via web by Clint Tate
Final12/24/201312/24/201312/24/2013PPART
DetailsDaryl DeGrange
Bud on site. Final for Phase 2B and staff lounge. Phone #: ###-#### >> Inspection requested via web by Clint Tate partial final ok
Electrical Rough-In12/17/201312/18/201312/18/2013PPASS
DetailsDaryl DeGrange
Requesting ceiling inspection for 12/18/13 afternoon. Please contact Bud Horsley with any questions. Phone #: ###-#### >> Inspection requested via web by Clint Tate rough-in ok cover ceiling grid SAR phase 2B
Electrical Rough-In12/10/201312/12/201312/12/2013APASS
DetailsDaryl DeGrange
Bud on site. Ceiling inspection. Staff lounge. Phone #: ###-#### >> Inspection requested via web by Clint Tate rough-in ok cover
Final11/26/201311/27/201311/27/2013APART
DetailsDaryl DeGrange
Bud on site. Request partial final for CCD-011 - temporary exam rooms. Phone #: ###-#### >> Inspection requested via web by Clint Tate partial final ok
Rough-In Permanent Service11/8/201311/12/201311/12/2013ACANC
DetailsDaryl DeGrange
A ceiling inspection for the CCD number 011 is being requested. Please contact Bud Horsely with any questions. Phone #: ###-#### >> Inspection requested via web by Clint Tate
Electrical Rough-In11/12/201311/12/201311/12/2013PPASS
DetailsDaryl DeGrange
A ceiling inspection for the CCD number 011 is being requested. Please contact Bud Horsely with any questions. Phone #: ###-#### >> Inspection requested via web by Clint Tate rough-in ok cover ceiling grid
Electrical Rough-In11/8/201311/12/201311/12/2013APASS
DetailsDaryl DeGrange
A wall inspection for the 2B phase of this project is being requested. Please contact Bud Horsely with any questions. Phone #: ###-#### >> Inspection requested via web by Clint Tate rough-in ok cover
Electrical Rough-In11/1/201311/4/201311/4/2013APASS
DetailsDaryl DeGrange
Bud on site. Wall rough-in for Phase 2B South Phone #: ###-#### >> Inspection requested via web by Clint Tate rough-in ok cover walls
Electrical Rough-In10/22/201310/23/201310/23/2013APASS
DetailsDaryl DeGrange
Bud on site. Wall rough-in. Phone #: ###-#### >> Inspection requested via web by Clint Tate Rough-in ok cover east and south walls in phase 2
Electrical Rough-In10/8/201310/9/201310/9/2013APASS
DetailsDaryl DeGrange
Rough in for the Temp Exam Rooms. Bud Horsely is the contact. Phone #: ###-#### >> Inspection requested via web by Clint Tate rough-ok cover
Final9/19/20139/20/20139/20/2013APART
DetailsDaryl DeGrange
Bud on site. Do not close permit. This is a final for the x-ray and phase 2A only. Phone #: ###-#### >> Inspection requested via web by Clint Tate Partial final ok UL listed X-ray equipment
Final9/12/20139/13/20139/13/2013APART
DetailsDaryl DeGrange
Bud on site. Final for Phase 2A. Phone #: ###-#### >> Inspection requested via web by Clint Tate partial final ok
Electrical Rough-In8/29/20138/29/20138/29/2013APASS
DetailsDaryl DeGrange
rough-in ok cover ceiling grid phase 2A
Final8/28/20138/29/20138/29/2013ANR
DetailsDaryl DeGrange
Ceiling final for phase 2A. Phone #: ###-#### >> Inspection requested via web by Clint Tate Not ready for final at this time.
Electrical Rough-In7/24/20137/24/20137/24/2013APASS
DetailsDaryl DeGrange
underground for three ballards at front entry drive rough-in ok cover
Conference7/23/20137/24/20137/24/2013APASS
DetailsDaryl DeGrange
Sheet rocking one side of walls in temp exam room. Phone #: ###-#### >> Inspection requested via web by Clint Tate Ok cover one side Over Flow room, exterior walls
Electrical Rough-In7/3/20137/8/20137/8/2013APASS
DetailsDaryl DeGrange
Phone #: ###-#### >> Inspection requested via web by Clint Tate rough-in ok cover front entry lobby as per highlighted and dated on plans
Electrical Rough-In6/27/20136/28/20136/28/2013APASS
DetailsDaryl DeGrange
Partial wall rough-in for phase 2A, Emergency Room remodel. Phone #: ###-#### >> Inspection requested via web by Clint Tate rough-ok cover area highlighted and dated
Electrical Rough-In6/20/20136/21/20136/21/2013APASS
DetailsDaryl DeGrange
Wall rough in for exam rooms in phase 2A Phone #: ###-#### >> Inspection requested via web by Clint Tate rough-in ok cover as highlighted and dated on plans
Conference6/5/20136/6/20136/6/2013ADONE
DetailsDaryl DeGrange
Bud on site. Conference to discuss sheet rocking one side of exam room walls. Phone #: ###-#### >> Inspection requested via web by Clint Tate Discussed need to hang sheet to install cable trays, one side ok only in areas of cable tray.
Final3/4/20133/5/20133/6/2013APART
DetailsDaryl DeGrange
Please keep permit open. This is a final for phase 1 only. Phone #: ###-#### >> Inspection requested via web by Clint Tate Partial final Phase One ok
Electrical Rough-In2/22/20132/25/20132/25/2013APASS
DetailsBob Reichert
Bud on site. Ceiling inspection. Phone #: ###-#### >> Inspection requested via web by Clint Tate ok cover phase 1 ceiling only anop
Electrical Rough-In1/23/20131/25/20131/25/2013APASS
DetailsDaryl DeGrange
Rough in wall inspection. Phone #: ###-#### >> Inspection requested via web by Clint Tate rough-in ok cover walls exam rooms as highlighted and dated on plans
Electrical Rough-In1/8/20131/9/20131/9/2013APASS
DetailsDaryl DeGrange
Bud on site. Phone #: ###-#### >> Inspection requested via web by Clint Tate rough-in ok cover walls as per highlighted and dated on plans
Conference11/6/201211/7/201211/7/2012ADONE
DetailsDaryl DeGrange
Phone #: ###-#### >> Inspection requested via web by Clint Tate NEC 110.26(F)(1)(a) Dedicated Electrical Space The space equal to thr width and depth of the equipment and extending from the floor to a height of 6ft. above the equipment to the structural ceiling shall be dedicated to the elecetrical installation. No piping,ducts,leak protection apparatus or other equipment foreign to the electrical installation shall be located in this zone. Shall relocate duct, provide drip gutter over non-access area of Critical operation power system equipment
Issue PAID IN FULL permit  11/6/2012 DONE
Payment received via Govolutions
Application received  11/6/2012 DONE
This permit was created on the web by Clint Tate