Final | 3/14/2013 | 3/14/2013 | 3/14/2013 | P | PASS |
Daryl DeGrange
|
|
|
kurt Phone #: ###-#### - before 3 if possible - call prior to going No tub in master bathroom at time of final final ok
|
Electrical Rough-In | 1/29/2013 | 1/30/2013 | 1/30/2013 | A | PASS |
Daryl DeGrange
|
|
|
kurt Phone #: ###-#### motorized tub removed from property, correction done rough-in ok cover
|
Electrical Rough-In | 1/23/2013 | 1/24/2013 | 1/24/2013 | A | FAIL |
Daryl DeGrange
|
|
|
after 8:30 please call ahead - Kurt Phone #: ###-#### NEC 210.52 (2)(1) receptacle spacing in bedroom Motorized tub on site without qualified third party testing labortory tag
|
Conference | 1/4/2013 | 1/7/2013 | 1/7/2013 | A | DONE |
Daryl DeGrange
|
|
|
Kurt-PLease call prior to inspection Phone #: ###-#### Discussed with homeowner requirements for master bath and bedroom addition, motorized tub on site without third party testing tag
|
Application received | | | 12/3/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/3/2012 | | DONE |
Barbara Stitt
|
|
|
|