(F) Reprint permit | | | 4/1/2013 | | DONE |
|
|
|
|
Case Summary (ELE) | | | 4/1/2013 | | DONE |
|
|
|
|
Permanent Service | 12/11/2012 | 12/12/2012 | 12/12/2012 | A | CANC |
Rock A. Hudson
|
|
|
Mike Phone #: ###-#### Needed rough in and final inspection on location of water heater circuit and previously installed conduit
|
Final | 12/12/2012 | 12/12/2012 | 12/12/2012 | P | PASS |
Rock A. Hudson
|
|
|
Mike Phone #: ###-#### Moved water heater circuit to house panel and checked previously installed conduit. Final ok
|
Electrical Rough-In | 12/12/2012 | 12/12/2012 | 12/12/2012 | P | PASS |
Rock A. Hudson
|
|
|
Mike Phone #: ###-#### Moved water heater circuit to house panel and checked previously installed conduit rough in ok
|
Application received | | | 12/11/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/11/2012 | | DONE |
Barbara Stitt
|
|
|
|