Final | 1/11/2013 | 1/11/2013 | 1/11/2013 | P | PASS |
Bob Reichert
|
|
|
MIke Phone #: ###-#### ok final
|
Electrical Rough-In | 12/21/2012 | 12/21/2012 | 12/21/2012 | P | PASS |
Bob Reichert
|
|
|
Mike-Please call prior to inspection Phone #: ###-#### ri ok
|
Electrical Rough-In | 12/18/2012 | 12/19/2012 | 12/19/2012 | A | CANC |
Bob Reichert
|
|
|
michael Phone #: ###-#### see conf
|
Conference | 12/19/2012 | 12/19/2012 | 12/19/2012 | P | DONE |
Bob Reichert
|
|
|
michael Phone #: ###-#### talked about outlet spacing, free length conductor, box sizes for box fill
|
Application received | | | 12/18/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/18/2012 | | DONE |
|
|
|
|