First Notice | 2/15/2013 | 2/15/2013 | 2/25/2013 | | DONE |
Daryl DeGrange
|
|
|
This permit finaled on the web by Tim Dunlop
|
Final | 2/12/2013 | 2/15/2013 | 2/15/2013 | A | PASS |
Daryl DeGrange
|
|
|
already did rough in on lighting retrofits, just getting final Phone #: ###-#### >> Inspection requested via web by Tim Dunlop final ok
|
Electrical Rough-In | 1/31/2013 | 1/31/2013 | 1/31/2013 | P | CANC |
Rock A. Hudson
|
|
|
rough in on retrofit. besides LED project also got expanded to T12 to T8 lighting retrofit in interior common area Phone #: ###-#### >> Inspection requested via web by Tim Dunlop % LED fixtures on back of Mac Life portion of building. Editted wrong job
|
Electrical Rough-In | 1/31/2013 | 1/31/2013 | 1/31/2013 | A | PASS |
Rock A. Hudson
|
|
|
rough in on retrofit. besides LED project also got expanded to T12 to T8 lighting retrofit in interior common area Phone #: ###-#### >> Inspection requested via web by Tim Dunlop Only central hall, baths, and outdoor fixtures changing. UL listing confirmed. Rough in ok
|
Issue PAID IN FULL permit | | | 1/28/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/28/2013 | | DONE |
|
|
|
This permit was created on the web by Tim Dunlop
|