Final | 4/29/2013 | 4/29/2013 | 4/29/2013 | P | PASS |
Daryl DeGrange
|
|
|
robert Phone #: ###-#### final ok
|
Permanent Service | 3/26/2013 | 3/27/2013 | 3/27/2013 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Robert Murray Main breaker reduced to 80 ampere for #2 SER p/s u/g n ok
|
Electrical Rough-In | 3/26/2013 | 3/26/2013 | 3/26/2013 | A | PASS |
Daryl DeGrange
|
|
|
Rough-in ok cover No permanent service
|
Rough-In Permanent Service | 3/25/2013 | 3/26/2013 | 3/26/2013 | A | FAIL |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Robert Murray NEC 310.15(B)(2) Conductor adjustment factor-more than 3 current carring conductors in a raceway or cable.
|
Issue PAID IN FULL permit | | | 3/25/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/23/2013 | | DONE |
|
|
|
This permit was created on the web by Robert Murray
|