Final | 12/3/2013 | 12/3/2013 | 12/3/2013 | P | PASS |
Bob Reichert
|
|
|
Sloan Phone #: ###-#### ok final
|
Final | 11/25/2013 | 11/25/2013 | 11/25/2013 | P | PART |
Bob Reichert
|
|
|
sloan If he does not answer door-he is in back yard. PLEASE call before going out Phone #: ###-#### told to finish basement and then call for final
|
Electrical Rough-In | 5/23/2013 | 5/23/2013 | 5/23/2013 | P | PASS |
Bob Reichert
|
|
|
sloan or call ###-#### please call 30 min before going out Phone #: ###-#### corrections made, ok cover upstairs
|
Electrical Rough-In | 5/22/2013 | 5/22/2013 | 5/22/2013 | P | FAIL |
Bob Reichert
|
|
|
###-#### Sloan please call 20 min before going out Phone #: ###-#### shall do make-up and ground metal boxes, add flex in basement, strap nm within 12" of box
|
Electrical Rough-In | 5/7/2013 | 5/8/2013 | 5/8/2013 | A | PASS |
Rock A. Hudson
|
|
|
stanley or call work # ###-#### please call 15 min before going out Phone #: ###-#### Main floors wall rough in ok cover
|
Conference | 4/30/2013 | 5/1/2013 | 5/1/2013 | A | DONE |
Bob Reichert
|
|
|
cell # or work is ###-####--Sloan Phone #: ###-#### reviewed code and wiring required for inspection, will need several trips
|
Application received | | | 4/30/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/30/2013 | | DONE |
Barbara Stitt
|
|
|
|