Temporary Service | 5/31/2013 | 5/31/2013 | 5/31/2013 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Emmet Bushman t/s u/g n ok
|
Temporary Service | 5/29/2013 | 5/30/2013 | 5/30/2013 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Emmet Bushman 250.24(A)- Grounding electrode conductor connection shall be made at the same terminal or bus as grounded conductor. 110.7- GFCI receptical on right has test button stuck in depressed state. Replace. Remove debris from mater base.
|
Issue PAID IN FULL permit | | | 5/29/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/29/2013 | | DONE |
|
|
|
This permit was created on the web by Emmet Bushman
|