VOIDED CHANGE STATUS | | | 10/18/2013 | | DONE |
Barbara Stitt
|
|
|
Per phone call from Shawn they no longer need this permit it was just to get a conference inspection and now have the electrical permit for the project which is ELE13-02057//BAS
|
Conference | 6/27/2013 | 7/1/2013 | 7/1/2013 | A | DONE |
Rock A. Hudson
|
|
|
Sean. Conference on existing main switchboard at 11:00AM if possible. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Discussed service rennovation, panic hardware on electrical room door, work space being increased by removal of wall in elec. room, refeeding firepump, signage for second service on building.
|
Issue PAID IN FULL permit | | | 6/27/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/27/2013 | | DONE |
|
|
|
This permit was created on the web by Sean DeLacy
|